Loading...
Park West CC(1)-CS 960222The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 February 22, 1996 Doug McDonald McFadden & Miller Inc. 11350 Luna Road P.O. Box 59882 Dallas, Texas 75229 FEb 61996 PUBLIC WORKS RE: Park West Commerce Center Development Fee Assessment Dear Mr. McDonald: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Park West Commerce Center. Please make payment to the City of Coppell in the amount of $11,925.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Per Birdsall, Interim Street Superintendent Rick Wieland, Parks Development Coordinator CITY OF COPPI~,I.L DEVELOPMF_,NT FEES Date: February 22, 1996 Project: Park West Commerce Center (Revised) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 186.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 35.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 186.65 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Projec0 available Park Fee (505 due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $12,818.30 $11,925.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * Thisfeecann~tbeassessedunti~af~erTUE~ectricsubmitsthe~ightingp~anf~rthepr~p~sedpr~ject. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING ~EHORANDUM DATE TO: FROM RE: February 22, 1996 Mike Martin, E.I.T. Ted Dutt, Interim Utilities Superintendent Development Fees for Park West Commerce Center (Revised) The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's ~ - 8'__' Fireline Meter/s = 2.5 ESU's/~.~~ Total. ~5 ESU's @ $450.00 em = $ 8,325.0~.~.// ~ o~ '~///~oa~ 100% due prior to Council approval of the final pla~~/ Wastewater Impact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 2 Connections @ $100.00 each = ~ 200.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (All Development) 1 lots ~ S 50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 2" Domestic Meters @ $186.65 = S186.65 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 2" Irrigation Meter/s ~ $186.65 ea = $186.65 2" - 8" Fireline Meter/s @ $ 2,378.20ea = $4,756.40 Total $4,943.05 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Fmm{ly or Non-Residential) 1 Meters @ $35.00 ea = S35.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters.