Loading...
Park West CC(1)-CS 951115ENGINEERING - STREET DIVISION MEMORANDUM DATE: TO: FROM: RE: November 15, 1995 Larry Davis, Construction Inspector Per Birdsall, Interim Street Superintendent (~ Walk Thru for Park West Commerce Center A walk through was conducted at the above referenced location today. The following deficiencies were identified: 2. 3. 4. Driveway approach at Airline on west side of driveway - - saw joint missing -- needs to be placed. North drive on Executive -- saw joints are missing in this drive. Please place and seal. Ail curb returns need to be sealed, including the redwood headers. Would like 4 safe hit posts on the east side of driveway on Wrangler around RCP head wall. PB/bc