Loading...
Park West CC(6)-CS 971205The City With A Beautiful Future Jerry Mays Prentis Properties limited, Inc. 1'717 Main St., Suite 5000 DnlIA., TX 75201 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The amount shown is an additional assessment do to the increased domestic meter size from a 2 inch to a 3 inch. Please make payment to the City of Coppell in the amount of $7,200.00 and forward to the Finance Dopad,-ent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to at~ched table for additional fees. Also provide a copy of the Engineer's estimate or conlract to our office so the construction inspection fee can be verified. Providing a copy of yofir paid receipt to the ~..~g Depa~hnent will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to workln~ with yOU on this project. If you have any questions, please contact me. Sincerely, /.~. .~ Kenneth M. ~ P,E. Director of Engineering & Public Works Jennifer Armslrong, Finance Director Doug Stevens, Engineering Te~-hnlcian Greg lones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Parkwest Commerce Center, Lot I1, Block 5 (Replat of Lot 2, Block 5 & 6) Date: 12/5/97 REVISED TOTAL AMOUNT DUE ruE Pmo t To COUNCIL APPROVAL Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Iss~mnce of Water Meter) Water Meter Fee (Domestic) $1,144.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) , . $5,114.18 (100% due at Iss-ance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fffeliue Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee -- $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) ?ark Fee $0.00 N/3 (100% due prior to Council Approval) Roadway Impact Fee °' $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Inform~tlon not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project ava~able at this time Construction Inspection Fee Need submitud of development contracts FOTAL $13,893.68 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,200.00 ** See attached development fee workshec~ DEVELOPMENT FEE WORKSHEET PROJECT: Parkwest Commerce Center, Lot 11, Block $ (Rapist of Lot 2, Block $ & 6) DATE: 12/5/97 REVISED Water Impact Fee: Domestic Metar(s): Irrigation Matar(a): Firaline Metar(s): I - 3 inch 16 ESU's I - 2 inch 8 ESU's ESU'a 2 - 8 inch 2.5 ESU's Total #: 26.5 ESU's @ $450.00 aa. (100 % due prior to Council approval of the final plat) $11,925.00 (-$8,325.00) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to iss~aRce of building permit) (All other developments due prior to issuance of meter) $200.00 $1,144.50 $195.98 $0.00 $4,918.20 $30.00 $105.00 $7,200.00 Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s} @ $1,144.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (lrrigation/Fireline): Total #: 1 Irrigation Metar(s) @ Total #: 0 Additional Irrigation Meter(s} @ Total #: 2 Fireline Metar(s) @ (100% due prior to issuance of water meters) $195.98 $2,459.10 Water Meter Deposit Fee (Domestic): Total #: I Metar(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 16 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) · (-$3,600.00) $50.00 Utility Final Inspection Fee (AU developments): Total #: I Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) · Previously Paid amount on 12/11/96 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdentiai Developments Only): * Preliminary pint approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $25,440.00 (-$25,440.00) Information not available at Ibis time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) * Previously Paid amount on 12/11/96 Need submittal of development cona'acts Page 2