Park West CC(6)-CS 971205The City With A Beautiful Future
Jerry Mays
Prentis Properties limited, Inc.
1'717 Main St., Suite 5000
DnlIA., TX 75201
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development. The amount shown is an
additional assessment do to the increased domestic meter size from a 2 inch to a 3 inch.
Please make payment to the City of Coppell in the amount of $7,200.00 and forward to the
Finance Dopad,-ent along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to at~ched
table for additional fees. Also provide a copy of the Engineer's estimate or conlract to our office
so the construction inspection fee can be verified.
Providing a copy of yofir paid receipt to the ~..~g Depa~hnent will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to workln~ with yOU on this project. If you have any questions, please contact me.
Sincerely, /.~. .~
Kenneth M. ~ P,E.
Director of Engineering & Public Works
Jennifer Armslrong, Finance Director
Doug Stevens, Engineering Te~-hnlcian
Greg lones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Parkwest Commerce Center, Lot I1, Block 5 (Replat of Lot 2, Block 5 & 6)
Date: 12/5/97 REVISED
TOTAL AMOUNT DUE
ruE Pmo t To
COUNCIL
APPROVAL
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Iss~mnce of Water Meter)
Water Meter Fee (Domestic) $1,144.50
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) , . $5,114.18
(100% due at Iss-ance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fffeliue Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee -- $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
?ark Fee $0.00 N/3
(100% due prior to Council Approval)
Roadway Impact Fee °' $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Inform~tlon not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project ava~able at this time
Construction Inspection Fee Need submitud of
development contracts
FOTAL $13,893.68
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,200.00
** See attached development fee workshec~
DEVELOPMENT FEE WORKSHEET
PROJECT: Parkwest Commerce Center, Lot 11, Block $ (Rapist of Lot 2, Block $ & 6)
DATE: 12/5/97 REVISED
Water Impact Fee:
Domestic Metar(s):
Irrigation Matar(a):
Firaline Metar(s):
I - 3 inch 16 ESU's
I - 2 inch 8 ESU's
ESU'a
2 - 8 inch 2.5 ESU's
Total #: 26.5 ESU's @ $450.00 aa.
(100 % due prior to Council approval of the final plat)
$11,925.00
(-$8,325.00)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to iss~aRce of building permit)
(All other developments due prior to issuance of meter)
$200.00
$1,144.50
$195.98
$0.00
$4,918.20
$30.00
$105.00
$7,200.00
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s} @ $1,144.50
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (lrrigation/Fireline):
Total #: 1 Irrigation Metar(s) @
Total #: 0 Additional Irrigation Meter(s} @
Total #: 2 Fireline Metar(s) @
(100% due prior to issuance of water meters)
$195.98
$2,459.10
Water Meter Deposit Fee (Domestic):
Total #: I Metar(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
16
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
· (-$3,600.00)
$50.00
Utility Final Inspection Fee (AU developments):
Total #: I Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
· Previously Paid amount on 12/11/96
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdentiai Developments Only):
* Preliminary pint approved prior to June 23, 1992:
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$25,440.00
(-$25,440.00)
Information not
available at Ibis time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
* Previously Paid amount on 12/11/96
Need submittal of
development cona'acts
Page 2