Loading...
Park West CC(6)-CS 960927~The City With A Beautiful Future Jerry Mays Prel~tJs Properties LimRed, Inc. 1717 Main St. Suite 5000 Dallas, TX 75201 P.O. Box 478 Coppell, Texas 75019 214-462-0022 September 27, 1996 Parkwest Commerce Center, Lot 1, Block 5 (Replat of Lot 2, Block 5 & 6) Development Fee Assessment Dear Mr Mays: Enclosed is a copy of thc City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in thc amount of $37,365.00 and forward to the Finance Deparmaent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depathuent will help ns to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Since~ly, ~, A~istant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services Dennis Chovan, Halff & Associates D VELOPMENT FEE TABL Project: Parkwest Commerce Center, Lot I, Block 5 (Replat of Lot 2, Block 5 & 6) Date: 9/27/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigafion/Fireliue) $5,357.78 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) ~ Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildinl~ Permi0 Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $25,440.00 $25,440.00 (100% due prior to Council Approval) Street Light Fee Info.nation not ( 100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Neea submittal of development contracts tOTAL $43,353.76 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $37,365.00 ~-~ D,~VELOPMENT FEE WORKSHEt: ( PROJECT: DATE: 9/27/96 Parkwest Commerce C~nter, Lot I, Block $ (Replat of Lot 2, Block $ & 6) Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter{s): I - 2 inch = 8 ESU's I - 2 inch = 8 ESU's = ESU'a 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap lnnpeetion Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total 8: I Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/l~eline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $2,580.90 Water Meter Deposit Fee (Domestic): Total #: I Meter{s) @ $30.00 ea. (100% due prior to issuance Of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter{s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @$450.00ea. Wastewater Tap In.~pection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) · $8,325.00 .$200.00 $195.98 $195.98 $0.00 $5,161.80 $30.00 $105.00 $3,600.00 $50.00 $50.00 Page 1 D~VELOPMENT FEE WORKSHEE, Park Fee (For Resdential Developments Only): * [~-eliminai~ plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Prellmln~wy plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Prellmlnnry plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $25,440.00 Information not availabl~ at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) lnfommdon not available at this time Construction lngpection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULA~I'~ONS PROOF. CT: DATE: Parlavest Comm~r~ Center, Lot 1, Block 5 (P~pi~t of Lot 2, Block ROADWAY IMPACT FEE: · Ft.) per Development Unit ** -- (Develw~m Units) x 10 Indus~al 320 1.06 $3OO $101,760.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) $76,320.00 75 % Credit as per approval by City Manager =