Park West CC(7)-CS 990415 (2)COPPELL STREETS DIVISION
A~ril 15, 1999
Larry Davis, Construction Inspector
Larry Morton, Streets Division
Walk-thru Lakeview Center 4/15/99
Listed below are Street Division comments relative
1.
to walk thru.
Clean and seal all joints in approach off Beltline.
Repair or replace corner of barrier-free ramp where it was
sawed all the way through in approach off Wrangler.
3. Clean and seal all joints in approach off Wrangler.
Rout and seal crack at manhole block out in approach off of
wrangler.
MESSAGE
CONF I RMAT I ON
04,'15/99 14:42
IDzCITY OP OOPPELL
DATE
04/15
S,R-TIME DISTANT STATION ID MODE PAGES
00'20" CITY OF COPPELL CALLING 01
RESULT
OK 0000