Loading...
Park West CC(7)-CS 980810The City With A Beautiful Future PO. BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 August 10, 1998 Jerry Mays Prentis Properties Limited, Inc. 3890 West Northwest Hwy., Suite 400 Dallas, TX 75220 Parkwest Commerce Center, Lot 2, Block Development Fee Assessment Dear Mr. Mays: Enclosed is a copy of the City of Coppell Development Fee Assessment table; along with a copy of the Development Fee calculations for the referenced development. Please make paymen~ to the City of Coppell in the amount of $81,537.78 and forward to the Finance Depa~,uent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depathiient will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician ~ ltottoweil, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services .2VELOPMENT FEE TAB~_~ Project: Parkwest Commerce Center, Lots 1 & 2, Block $ Date: 8/10/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) ~ $384.30 (100% due at Iss, snce of Water Meter) Water Meter Fee (IrrigationfFireline) $3,074.40 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fcc $62,412.78 $62,412.78 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this ~ Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need vabminal of development coatract: TOTAL $85,526.48 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $81,537.78 D.'"/ELOPMENT FEE WORKSH:"~-:T PROJECT: Peri. est Commerce Center, lots 1 & 2, Block $ DATE: 8/10/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch = 16 ESU's I - 2 inch = 8 ESU's = ESU's 1 - 8 inch = 2.5 ESU's Total fh. 26.5 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 : Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) ~ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigatioa/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) ~} $192.15 Total #: 0 Additional Irrigation Meter(s) ~ Total #: 1 Fir#line Meter(s) ~} $2,882.25 (100% due pdor to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0: 2 Meter(s) ~ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total ~. 2 Meter(s) ~ $30.00 ea. (100% due prior to issuance of watar meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 Wastewater Tap Inspection Fee: Total 0: 2 Connections ~} $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots (~ $50.00 ea. (100% due prior to issuance of building permit) $11,925.00 $200.00 $384.30 $192.15 $0.00 $2,882.25 $70.00 $60.00 $7,200.00 $100.00 $100.00 Page 3 D~/ELOPMENT FEE WORKSH~'~.T Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: I~VA N/A Single-family @ $150.00 1 Lot Multi-family Q $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: Single-family Q $350.001 Lot Multi-family ~ $350.00 1 Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A NIA Single-family ~ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Efaca'ic submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of devalopmant) N/A N/A N/A N/A N/A N/A $62,412.78 ~ormadoa not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 RO~ WAY IMPACT FEE CALCUL. .IONS PROJECT: DATE: Parkwest Commerce Center, Lot~ 1 & 2, Block 5 8/10/98 ROADWAY IMPACT Service Area * C~_!e$ory ** land Use ** Btl~dln~ Size (Sq. lt.) Developm~m Units ** Vehl,!~ Miles per Development Unit ** Fee ~r Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (V~hlde Miles per Development Ual0 x (Fee I? Vehicle Mile) 10 General Office Buildiag 208.564 208.564 3.99 $3O0 $249.651.11 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per approval by City Manager $187,238.33