Loading...
Park West CC(1)-PT 980722~ore/Excavation in Public Righ=-Of-Way Perm£~ City of Coppe!l - Public Works Department Date: Permit Issued To: Name: Address: Project Name: Phone: ~mergency Phone: ..{ % Inspector: llave ~11 City and/or Franchise Utilities Been Contacted and Existing Utilities Located: YES / NO Will It Be NecessaI-y to Excavate Street, A~ley or Sidewalk Pav~ent? · . YES (attach permit) ~ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. A~cea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa~-~nnents prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach ~-arricading/Detour applicable. Plan if a lane or street closure franchise/Contractor keprese~tatlve '~ Date Franchise Inspector/or City Inspector Approved/City Re.~.~s en~a 6kve Date Applicant shall indemnify and forever hold ha~-nless against each and eve~/ claim, demand o~ cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such pe_~n, it is granted. PER,MIT. plln All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project~ * NO WET BORES ALLOWED!