Loading...
Park West CC(6)-PT 980430Bore/Excavation in Public Right-Of-Way Permit City of C0ppe!l Date: 4 / '~) / ~1~ Permit Issued To: Name: Address: - Public Works Department Project Name: Phone: ~mergency Phone: Representing: ~e of Work/General Desc=iption: ~Vi~ ~WO ~V ~ IIave ~11 City and/or Franchise Utilities Been Contacted and Existinq Utilities Located: YES ~ NO Will It Be Necessary to Excavate Street, Pavement? YES (attach permit) l%lley or Sidewalk Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works DeparTnnents prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PEfhHIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contracto~ 'R'eprese~ Dane Franchise Inspector/or City Inspector Ap.~vec~epres en~a ~ive Date Date Applicant shall indemnify and forever hold ha~less againsn each and eve~/ claim, demand or cause of action thau may be made or come against Lt by reason of or Lf any way arising ouu of the closure, blecking, excavating, cutting, tunneling, or other work by the applicann under pe~it from the City, if such pe~it is granted. PERi, IT. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. %~NOWET BORES ALLOWF..D!