ST9301-CS 931104DALLAS COUNTY
PUBLIC WORKS
November 4, 1993
Mr. Phil Weston, P.E.
Project Manager
Sverdrup Corporation
4311 Oak Lawn, suite 300
Dallas, Texas 75219
Re:
Sandy Lake Road Project No. 91-830
(MacArthur Boulevard to Coppell East City Limits)
Dear Mr. Weston:
The City of Coppe11 has returned their review set of your revised
curb and right-of-way alignment plans. The following
Coppell/County comments pertaining to this plan dated July 28, 1993
are provided:
COVER SHEET
Provide Stationing on cover sheet layout as indicated·
SHEET/TYPICAL SECTIONS
Previous request -- include a typical section for a left-turn,
right-turn and for the asphalt transition section.
Please revise your typical sections to show the future
pavement width for Sandy Lake Road to be 12 ft. in order to
provide for two-36 ft. f/f of curbs future roadways with a 16
ft f/f median and 10.5 ft. parkways in a 110 ft. right-of-way.
SHEET STATION 13+00 TO 18+50
1. The portion.of Sandy Lake Road west of MacArthur Boulevard,
needs to be coordinated with Coppe11's Consultant, Robert
Maly, with Rady and Associates. The telephone number for
contact is (817) 654-4266.
2. Provide 100 foot Stationing in plan view. (typical all
sheets)
3. Provide outside 3rd lane at major intersections where they can
then serve as a free right turn lane until future widening is
done.
411 Elm Street
Dallas, Texas 75202
653-7151
Mr. Phil Weston, P.E.
November 4, 1993
Page Two
SHEET 18+00 TO 24+00
1. See note 3 above.
2. Provide width of all existing pavement and the proposed
drives.
The intersection of the MacArthur Boulevard needs to comply
with the City's streetscape plan. (previous comment). Please
show this on your preliminary plan submittal.
Also include on the preliminary plan submittal the location of
conduit for traffic, street lighting and irrigation. (typical
all sheets)
m
Coppell has indicated they are still concerned about no median
opening at Kimball Court. Hopefully their public meeting will
resolve this matter.
SHEET 24+00 TO 29+50
Show trees on north side (previous comments).
SHEET 29+50 TO 34+00
No comment.
SHEET 34+00 TO 39+50
The City of Coppell has approved a planned development on the south
side of Sandy Lake Road which has a proposed street. Please
coordinate with Nathan D. Maier Consulting Engineers to obtain a
location for the proposed street. (see attached print of the
proposed development). Close the planned opening at 40+60 and
provide for a median with turn lane to serve the proposed street
for the planned development.
SHEET 39+50 TO 44+50
Close median opening at Station 40+60
SHEET 44+50 TO 48+50
No comment.
T
Mr. Phil Weston, P.E.
November 4, 1993
Page Three
SHEET 48+50 TO 53+00
1. Locate the Riverchase Drive median nose so that it won't have
to be relocated when Sandy Lake is eventually widened to six
lanes.
The City of Coppe11 has indicated that an additional 15 feet
was dedicated east of Riverchase Drive. Please locate and
show this right-of-way on your plans.
This additional right-of-way on the south side does not appear
to help reduce our overall right-of-way needs if we were to
try to utilize it, but, please take a look at this.
SHEET 53 TO 58+50
Show tree line on south side (previous comment).
~EET 58+50 TO 64+00
1. Show tree line on south side (previous comment).
2. Why is the Coppell 110 ft R.O.W. being reduced?
SHEET 64+00 To 69+00
1. You continue to show a lack of coordination with the Charles
Gojer firm. Please show their proposed bridge section, the
locatiOn of the west abutment, and how your pavement will tie
into their bridge section.
2. Why is R.O.W. being reduced? It appears the 110 ft. R.O.W.
should continue at least to end of bridge if not to the City
Limits· This requires coordination with the Charles Gojer
firm so that you both aren't preparing field notes for the
same parcels·
3. Show how your planned 24 ft. roadways will connect to the
bridge·
4. Show how the future proposed 36 ft. roadways will be connected
to the bridge· If an extra sheet is needed in order to show
how the 24 ft and 36 ft roadways will connect, then provide
one.
Mr. Phil Weston, P.E.
November 4, 1993
Page Four
While, there continues to be a question on what will happen at
Kimbel Court and how the right-of-way and pavement is to behandled
at the east end of the project, I believe you can now proceed with
your preliminary plans and right-of-way drawings. (The right-of-
way on east end is still not correctly shown and needs further
coordination with Gojer - enclosed is a print of the current Gojer
alignment and bridge section). The City of Coppell has requested
that you return both marked sets with your next submission.
Sincerely,
ProjeCt
nBEJ:vjm
closures: City of Coppell Letter of 10/26/93
Charles Gojer and Associates Prints
xc: Ken Griffin, P.E., city of Coppell
91 -~30:. k.~NDYLKII.D .LT~.