Park West CC(1)-CS 900423COPPELL PUBLIC NORK$ HEHOR/~DUH FROM: DATE: RE: Shohre Da~eshmand, Acting City Engineer Lar ry~S, Construction Inspector April 23, 1990 Park West Commerce Center Site 1 In review of the letter sent to Steve Goram from Don Davis dated April 11, 1990, regarding the sidewalk construction on the above mentioned project, I have several concerns regarding this particular staging of sidewalk construction requested. 1. The engineering plans submitted did not indicated sidewalk location and width. The sprinkler system, landscaping, and burham construction as permitted by the Building Inspections Office along Airline Drive is nearing completion and appears to be in direct conflict with sidewalk construction. It is my recommendation the sidewalk be completed on site 1 at this time and all future sidewalks be constructed at the time of each approved individual site development in Park West Commerce Center. If I can be if further assistance, please let me know. Thank you. CLD/bb xc: Steve Goram, Director of Public Works Ben dela Cruz, Engineering Technician PARKWEST.CLD