Park West CC(1)-CS 900423COPPELL PUBLIC NORK$
HEHOR/~DUH
FROM:
DATE:
RE:
Shohre Da~eshmand, Acting City Engineer
Lar
ry~S, Construction Inspector
April 23, 1990
Park West Commerce Center Site 1
In review of the letter sent to Steve Goram from Don Davis dated April
11, 1990, regarding the sidewalk construction on the above mentioned
project, I have several concerns regarding this particular staging of
sidewalk construction requested.
1. The engineering plans submitted did not indicated sidewalk
location and width.
The sprinkler system, landscaping, and burham construction as
permitted by the Building Inspections Office along Airline Drive
is nearing completion and appears to be in direct conflict with
sidewalk construction.
It is my recommendation the sidewalk be completed on site 1 at this time
and all future sidewalks be constructed at the time of each approved
individual site development in Park West Commerce Center.
If I can be if further assistance, please let me know. Thank you.
CLD/bb
xc: Steve Goram, Director of Public Works
Ben dela Cruz, Engineering Technician
PARKWEST.CLD