Loading...
ST9301-CS 931004DALLAS COUNTY PUBLIC WORKS October 4, 1993 Mr. Kenneth M. Griffin, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Sandy Lake Road Project 91-830 MacArthur Boulevard to Coppell East City Limits Revised Curb and Right-of-Way Alignment Plans Dear Mr. Griffin: Accompanying this letter are two sets of revised curb and right-of-way alignment :plans, along with the marked set of prints of the original curb and right-of-way alignment for this project. The curb and right-of-way alignment has been revised to reflect the City's requested change to. build the inside four lanes rather than the outside four. The revised alignm~t~ provides for a minimum centerline radius of 850 feet as requested. !, ii~' These alignment plans do not yet reflect the location of conduit for the future irrigation or street lighting systems or the brick pavers which have been requested. This type of information will be provided after we have an approved alignment and begin work on the preliminary paving plans. Please review these revised plans to determine whether or not this revised curb and right-of-way alignment plans meets with the City's approval. If you plan to hold a neighborhood meeting or public hearing, please let me know as to whether or not you would like me to attend. We would appreciate your returning these plans with your commits and/or approval by October 25, 1993. Sincerely, / enclosure fde830:\RCurbROW.ltr 411 Elm Street Dallas, Texas 75202 653-7151 ~ -r ir C4RROI TON Septen-ber 29,1993 Mr. Bud Beene, P.E. Director of Public Works Dallas County Public Wod<s 411 Elm Street Dallas, Texas 75202 Dear Bud, The City of Carrollton has expr_~___~ed a desire to include bike paths as part cd the Sandy Lake Road expansion project west of Old Denton Road. While the inclusion o~ bike paths is still desirable, funding is not available at this time from the City ol Carrollton to acquire add~ right-of-way and provide concrete pavement for bicycle trafrm. Ther~ore, due to funding limitations, the City cannot commit to supplemental funding for accommodating bicycle traffic at this time. The City o~ Carroilton will make an eff(xt to investigate future funding sources. It is, therefore, recommended that Dallas County prepare an alternate construclk)n bid specif'~at ion for a design that would ac(x)mmodate future bicycle traffic at the Elm Fork Trinity River bridge and the IH-35E overpass. This would allow Dallas County and the affected cities to assess the cost of future acoommodatbns at two important links to a regional bike path system. Sincerely, I! · CL sy. Sy'lo Director of Transportation CS:sam .t~amn Johnson, Carrollton City Manager nk Trando, Acting Coppell City Manager Jan Hart, Dallas City Manager