Loading...
Park West CC(15)-AG 901211 AGENDA CITY COUNt= M]~TING December I1, ~ PUBLIC HEARING: Consideration and aplroval of a reldat of Park West Commerce , Block 7, Lot 1~ and Block 8, Lots 1, ~- and ?.A, bordered b~ Airline Drive, at SUBMITTED BY: ~ STAFF REP.: Gary L. Sieb, Planning Dh~ct~r OTHER REP.: DATE: Date of Planning & Zoning Comminn~m Meeting: November 8, 1990 De~ of Planning & Zoning Co~,,,~,na: Apln~ved (7-0) with the comiitim~ that Enterprise Drive Requ~t: Apl~oval of a replat of the Park West Comme~ce Cente~. Please see attached staff repm~ fc~ further BUDGET AMT. ~MT 4-/- BUDGET N/A LEGAL REVIEW BY: REVIEWED BY CM: ~~ CITY OF COPPELL PLANNING DEPARTNENT STAFF REPORT PARK WEST COI~fl~RCE CENTER - REPLAT BLOCK 7, LOT 1 - BLOCK 8, LOTS 1, 2, ~ 2A P & Z HEARING DATE: November 8, 1990 C. C. HEARING DATE: December ll, 1990 LOCATION: Bordered by Wrangler Drive, Enterprise Drive and Airline Drive. SIZE OF AREA: Total area of the replat is 27.79 acres. REOUEST: Approval of a replat of the Park West Coerce Center Addition. APPLICI~f: Prentiss/Copley Inv. 1509 LB3 Freeway Dallas, Texas 75234 (214) 484-3000 Engineer, Don Davis 5506 Cockrell Hill Road Dallas, Texas 75236 (214) 337-2332 HISTORY: The City Council approved a final plat for Park West Commerce Center on April 10, 1990 which contained a of 328 acres. total TRANSPORTATION: Park West Commerce Center replat is situated between two existing streets and one future street. Airline Drive, which is presently a 4-lane roadway, will serve as the main access for Lot 1 and 2R. Wrangler Drive (fonaerly Cowboy Drive), will provide access for Lot 3R, as it is developed. Wrangler Drive as it exists today, is a 2-lane, substandard asphalt roadway, and as Lot 3 develops and is replatted, the developer will be required to reconstruct Wrangler Drive along the frontage of Lot 3R, or establish an escro~ fund for future paving and drainage improveap~nts. Enterprise Drive will serve as a future roadway, to be installed by the developer, along the eastern boundary and soutberu property line of Lot 2R prior to construction of said lot. The r~ining portion of the roadway (southern portion) will be constructed before any develolaaent takes place on Lot 3R. ANALYSIS: The purpose of this replat is to create a building site for ITEM Lot 1. which is on the ground, to allow for construction of a new building on Lot 2R. No buildino permits will be issued for Lot 3Runtil a building site has been created, therefore, replatting must occur prior to development. Additional changes to the previous final plat included the relocation of the future Enterprise Drive, which will be shifted 335 feet to the west of the proposed location, as indicated on the replat sulmittal. Staff reco~nds approval of the replat. All DRC com~nts have been addressed. ALTEP~ATIVES: 1) Approve the replat. 2) Deny the replat. ATTACHMENTS: 1) Replat PWREPSTF