Park West CC(15)-CS 950606E~NEER~N~ - UTiLiTiES D~V~S~ON
mOI~NDU~
D~TE:
TO:
June 6, 1995
Larry Davis, Construction Inspector
Howard L. Pafford, Utilities Superintendent
Final Walk Through for Prentiss Propety Block 7 &
8 - Lone Plywood/Wrangler Drive
A follow-up walk through was conducted in the above referenced
subdivision. The following deficiencies were identified:
1. Uncover sewer manhold at tie-in on Airline Drive.
2. Inflow at manhold at Sta. 7 + 28, third manhold from
Beltline and Wrangler.
coif bo~om of manhold. First m~
3.
Clean
east of EnterprXse at Wrangler.~ I ~
lhold
To:
From:
RE:
MEMORANDUM
Howard Pafford, Utilities Superintendent
Rey Gonzales, Street Superimendem
Jeff Jones, Fire Marshal
Greg Jones, Chief Building Official
La~~, Construction Inspector
FINAL WALK-THRU for Prentiss Property Block 7 & 8
Lonestar Plywood/Wrangler Drive
Date: June 1, 1995
A final walk-thru for sanitary sewer on the referenced project has been scheduled for Tuesday,
June 6, 1995 at 8:30 a.m.
If I can be of further assistance please let me know.
CCi
Brian Holgate, w/Tridal FAX tt 817 481-8195
James Clark, FAX # 437-6708
Ken Griff'm, Asst. City Manager/City Engineer
file/ldavis/0walkthru.mm