Loading...
Park West CC(15)-CS 950606E~NEER~N~ - UTiLiTiES D~V~S~ON mOI~NDU~ D~TE: TO: June 6, 1995 Larry Davis, Construction Inspector Howard L. Pafford, Utilities Superintendent Final Walk Through for Prentiss Propety Block 7 & 8 - Lone Plywood/Wrangler Drive A follow-up walk through was conducted in the above referenced subdivision. The following deficiencies were identified: 1. Uncover sewer manhold at tie-in on Airline Drive. 2. Inflow at manhold at Sta. 7 + 28, third manhold from Beltline and Wrangler. coif bo~om of manhold. First m~ 3. Clean east of EnterprXse at Wrangler.~ I ~ lhold To: From: RE: MEMORANDUM Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superimendem Jeff Jones, Fire Marshal Greg Jones, Chief Building Official La~~, Construction Inspector FINAL WALK-THRU for Prentiss Property Block 7 & 8 Lonestar Plywood/Wrangler Drive Date: June 1, 1995 A final walk-thru for sanitary sewer on the referenced project has been scheduled for Tuesday, June 6, 1995 at 8:30 a.m. If I can be of further assistance please let me know. CCi Brian Holgate, w/Tridal FAX tt 817 481-8195 James Clark, FAX # 437-6708 Ken Griff'm, Asst. City Manager/City Engineer file/ldavis/0walkthru.mm