Loading...
Park West CC(15)-CS 910103 GINN, January 3, M.S. Shohre/2~e~ .hmand, P. E. Dear Ms. Daneshmand: CONSULTING ENGINEERS The city of Coppell Public Works, Engineering, Streets, and Parks Departments' staffs have reviewed the above referenced plans for conformance to City ordinances and standards. The following sets forth our comments. At Sta. 0+62.5, Enterprise Drive, please provide a street header detail. Additionally, please specify asphalt transition as per the following minimum requirements: 4" Type "A", 2" Type "D", over 6" minimum lime stabilized base material or approved equal. On the drainage area map, please indicate (highlight) in some manner what is included as part of this project. On drainage Line "H", please provide angle at P.I. Sta. 0+50; provide details of headwall and rip-rap at Grapevine Creek; correct size of precast box culvert. On all storm drainage plans, please indicate/clarify which utilities are existing and which are proposed. On Line "H", please clarify discrepancy of pipe size where connection to 7'x5' box is made; 60" and 66" are both shown. On Sheet 10, Line "H", please clarify questions shown on plans, i.e. 6' vs. 7' manholes; existing 42" RCP between Sta. 16+09.67 and Sta. 16+79.67 not clear as to what is proposed; and, discrepancies in stationing and sizes of manholes. Please clarify pipe sizes from Sta. 16+09.67, Line "H", to Sta. 17+09.67. 17103 Preston Road · Suite ltd · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 8. On various drainage sheets, where laterals from inlets or from off-site connect to the main storm drainage lines, they are indicated to be placed where pipe size changes are made. We do not recommend making lateral connections at those points. Please address. 9. Provide a minimum 2'-6" clearance from the proposed storm sewer lines. See note on Sheet 13. Please have the engineer make the above corrections, return the marked up plans along with the corrected sets of final plans to the City of Coppell for stamping by the city Engineer. They need to submit as many sets of plans as they need stamped plus four (4) sets which will be retained by the city of Coppell. Should you have any questions, please contact our office. Sincerely, Gabe Favre GF/dsp cc: Don E. Davis, P.E. H. Wayne Ginn, P.E. File 90441