Park West CC(11)-CS 990622~ The City wi
/~ RO. BOX 478
COPPELL, TEXAS 75019
FO. Box 478
Coppell, Texas 75019
972-462o0022
June 22, 1999
Mr. Jon Jacobson
McFadden & Miller, Inc.
P.O. Box 59882
Dallas, TX 75229
RE: Parkwest Commerce Center, Lots 1 & 3, Block 7
Final Acceptance
Dear Mr. Jacobson:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincer~A/L~
L~ D~.~, (
ConstmOOon tnsp~4~
Mike Martin, Assistant City Engineer
Doug Stevens, Engineering Technician
Glenn Hollowell, Director of Public Worlt~
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Davis/pkwslfa2