Loading...
Park West CC(11)-CS 990622~ The City wi /~ RO. BOX 478 COPPELL, TEXAS 75019 FO. Box 478 Coppell, Texas 75019 972-462o0022 June 22, 1999 Mr. Jon Jacobson McFadden & Miller, Inc. P.O. Box 59882 Dallas, TX 75229 RE: Parkwest Commerce Center, Lots 1 & 3, Block 7 Final Acceptance Dear Mr. Jacobson: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincer~A/L~ L~ D~.~, ( ConstmOOon tnsp~4~ Mike Martin, Assistant City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Worlt~ Greg Jones, Chief Building Official Travis Crump, Fire Marshal Davis/pkwslfa2