Loading...
Park West CC(11)-CS 910517COPPELL PUBLIC WORKS ~IEMORANDUM DA TE : TO: FRO~4 : RE: May 17, 1991 Shohre Daneshmand, Actin~ City E~_~/~r__ Howard Pafford, ~ill~ie~s ~uper: Development Fees Lot 3 Block 7~Pa Center The following fees should be assessed on the above referenced project. Water Impact Fee: 4 - 2" i - i i/2" 2 - 10" Total 42 100% due prior to Council approval Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = ESU's 32 ESU's 5 ESU's 5 ESU's $660.00 ea = $27,720.00 of final plat. Wastewater Impact Fee: 4 - 2" Domestic Meter/s = 32 ESU's ~ $422.00 = $13,504.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 7 Connections ~ $100.00 each = $ 700.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee N/A Connections @ $100.00 each = 100% due prior to issuance of building permit. Street Lighting Fee N/A Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee N/A See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee N/A Residential Lots at $150.00 each = $ N/A N/A Units (Multi family) at $75.00 each = $ N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works PKWEST.HLP STREET SIGN ASSESSMENT for Lot 3 Block 7/Parkwest Commerce Center The following assessment is being made in accordance with the City of Coppell Subdivision ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER TOTAL * Cost breakdowns may be obtained from Public Works by written request. Revised 4/1/91