Park West CC(11)-CS 910517COPPELL PUBLIC WORKS
~IEMORANDUM
DA TE :
TO:
FRO~4 :
RE:
May 17, 1991
Shohre Daneshmand, Actin~ City E~_~/~r__
Howard Pafford, ~ill~ie~s ~uper:
Development Fees Lot 3 Block 7~Pa
Center
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
4 - 2"
i - i i/2"
2 - 10"
Total 42
100% due prior to Council approval
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
ESU's
32 ESU's
5 ESU's
5 ESU's
$660.00 ea = $27,720.00
of final plat.
Wastewater Impact Fee:
4 - 2" Domestic Meter/s = 32 ESU's ~ $422.00 = $13,504.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
7 Connections ~ $100.00 each = $ 700.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee N/A
Connections @ $100.00 each =
100% due prior to issuance of building permit.
Street Lighting Fee N/A
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee N/A
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
N/A Residential Lots at $150.00 each = $ N/A
N/A Units (Multi family) at $75.00 each = $ N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
PKWEST.HLP
STREET SIGN ASSESSMENT
for Lot 3 Block 7/Parkwest Commerce Center
The following assessment is being made in accordance with the City
of Coppell Subdivision ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
OTHER
TOTAL
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91