Loading...
Park West CC(17)-CS010119January 19, 2001 Jimmy Laxon McFadden & Miller, Inc. P.O. Box 59882 Dallas, Texas 75229 RE: Park West Commerce Center, Phase II, Lot 3R, Block 8 Final Acceptance Dear Mr. Laxon: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construcl ion Inspector John Skinner, Barson Utilities (fax 214-941-8533) David Littleton, Halff Assoc. (fax 214-739-0095) Jerome Baldwin, Potter Concrete (fax 214-689-1066) Mike Martin, Assistant City Engineer Debi Ingram, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal