Park West CC(17)-CS010119January 19, 2001
Jimmy Laxon
McFadden & Miller, Inc.
P.O. Box 59882
Dallas, Texas 75229
RE:
Park West Commerce Center, Phase II, Lot 3R, Block 8
Final Acceptance
Dear Mr. Laxon:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Construcl
ion Inspector
John Skinner, Barson Utilities (fax 214-941-8533)
David Littleton, Halff Assoc. (fax 214-739-0095)
Jerome Baldwin, Potter Concrete (fax 214-689-1066)
Mike Martin, Assistant City Engineer
Debi Ingram, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal