Park West CC(17)-CS000613 '(~7/~6/00 14:15 CitY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.376 ~02
~ .__..__~6,._:!0/00 i6:13 F~ 21~7307085 ~LFF ~5SOCl^'l~S ~002/005
COI~ELL,'TT-X,~ 750~9
,... i,/; ;F
D&vid Littl~o-, P.E.
Halff Associates, ~c.
8616 Northwest Plaza Drix. e
Dallas, TX 75225
JUN ] 5 ZOO0
Haiff A:sociatec.: :..
RE: Pn~k West Commer~ C~t~r, Lot 3a. Block 8
Fee Assessmeut Letter
P.O. I~ 478
C, opp~L Texas 7'5019
.June t3, 2000
Dc~r Mr. Lit~laon:
Enclosed :s a copy of the City of Coppell Development Fee Assessment table, along with
a copy of .he D~vclopmcol F~e calculi'ions for thc referenced dcvclopment.
Plea.~e make payment to thc City of Coppell in tho amount oir~ and forward to
dxc Finance Department along with a copy ofih~ Fee Assessment table. This amount is a
portion of the LS~es~ed i'e~ that need to be paid prior to Colmcii approval. ALso provide a
copy of fire En~er's eStimate or c~nWacl to our office $0 the construction impection
fee can be verified.
Providing a copy of you~ paid receipt to the Enginccriag Deparimmt VOl] help us to
:,erify the payment o£ tcquit~ fees and instuc a su~essful beginning of this project. We
look fomard to wotklng v, ith }ou an this project_ If you have any questions, please
contact m
Sincerely,
tient M, Collins,
Civil
CC:
l¢-miffr Armstrong, Finance Director
D,:bbic [nlpam, Secretary
Gler~ Hollowell, Assistant Director of Public Works
G~e8 Jon~, Chief i~itdi~'g Official
Guy Sims, Dii~i~of L~isure Servicea
'07/~/00 14:16 CITY OF' COPPELL ENGINEERING -+ CITY OF COPPELL
u~, /~,uu ze~;,t-i r~A -"147~itTull'~ IIALFF A$$0(~IATE$
DEVELOP~NT FEE TABLE
~YoJect: Park West Cona~er~e C~nt~r, Lot
Date:
TOTAL AMOITNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Wa~,r ~ .mp.~t Fee $7,2~0.00 $7.200.00
(100~ a~e prior m Co,,~_.il Ap~wv~) ,,
Water Tap Inzp~tion Fee $100.00
(100~ due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1~.0~
(100~ d.~ at lssaznc~ o,f Wator Meter)
Water M,~:r Fee (ln'i~ation/Fireli~) $i92.05
(100 ~,.due at Is suanc~ of Water M~ter)
Water Meter Deposit (Dew. est*c)
(100~ due at ls~oance of Water Meter)
lr~igat/on/Firdme Meter Deposit ...... $~0.00
(~00~ ..d?e nt I~uan~e of Water Meter)
Watt, water Impact Fee $3,600.00 $3,600.00
(10~t due prior to ¢~1
W~t~.'ater Tap I~t~ct/on Fee SS0.00
(~0~ % d'ae a~ lszuance of Build/n~ Pmni0
Utility F~nnl ln.~pection Fee $50.00
,, (10C ~_~.ue at l~ua~¢ of Buildiag.l~rmi0
Park Fee ~0,00 ~.00
(10C'55 due prior to Coune. il Approv$1)
Roadway Impact F~ $9,222.00 $9,2~,,00
(I00'5~ due prio~ to Cou~il Approval)
S~"~t Light F~e Information not Availabl~
Strut Sign Fee I~formation not Awilab]e
(1o0,,~..~_~ prior to ~¢c.~p~ of Pro~.~
Construction L~p~tioa Fee Mformation not Available
TOTAL AMDU.~ DUE PRIOR TO ~OUNCII, APPRO~i~'-~ $20,022.00
'09/86/00 ld:16 CITY Of COPPELL ENGINEERING a CITY Of COPPELL NO. 3?6 ~
DEVELOPMENT FEE WORKSHEET
PROJECT: p~rk Wen Commerc~ Cedar, [,or 3R INoek 8
DATE:
Irrigatior, Meter(s):
Flmlina
I - 2 InCh = 6 EaU'a
1 - 2 k~h = 6 ESU's
0 = -- 0 ESU'e
0 -- 0 ESU's
Total ~: 16 ESU's · rdSO.O0 ea.
~ua ~ to Council el~roval of the final
Water Tap Jas.oecfion Fee:
To~l #: 2 Connectlm~ (~ S.50.00 ea.
(Single farrfly due prior t~ issuem:e of building I~"mit)
(All other develo(~l duo prior to isshanco of meter)
Domestic Water Meter Fee:
T~tal #? 1 Domestic Meter(s) ~ $192.05
(~i~gte fin',~ due prior to issuance of building ~
(All omer Cevelooments clue msor to mscance of motel')
Irrigatlon/Ft~line *6afar Meter Fee:
Total #: 1 Irrigstlo~ Meter(s) 4~ $102.05
Tc~al #: 0 Additlollal IFrioation Mot~'(e) {~ ~
Tctal #: ~ Fire#fi® MoMr(s) ~ SO.O0
(100/, due prk~ t~ issuer~e of wator motors)
Domestic Water Meter Deposit Fee:
Tc.ta~ #; 1 Meto*(o) ~ $35.00 ea.
(1 ~o% due prior to i~suence of wate~ meters)
irriptlon/Flre Meter Deposit Fee:
TC:~ #: 1 Meter(e) ~ S30.00 aa.
(lO~ue prior to J~uonce of water metes]
Wutewater Impact Fee:
T¢,t~l Domestic Meters ESU'$:
6
~ S4~0.00 ea.
Wastewater Tap lnsi~ectioo Fee:
Total #- 1 Connections ~ $~0.00 aa,
(100% clue prior tO iSsuaql;o of buli{~ing permit)
LTtllit7 Final lnapectJou Fee (AH developments)**
Toted #: 1 Lots ~) S60.00 ga.
(100% dun p~or to issuance of building j~'rrdt)
$?,200.00
$1O0OO
$19205 ....
$102.05
$~.00
$36.00
S30.00
Page
'07/06/00 14:16 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO. 3?6
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * prel;mlnaryp!st approved:
0
0
_ ~ir~le-family I~ ~0.00 ~ lot
Multi.family ~ ~.00 per unit
(~0% paid prl~' to Council approval of final plat)
(50% oaicl at is~onM of twlMIng permit)
Roadway Impact Fee:
(85e e~,~Ghed fie GBIO~I~Qns)
Street Lighting Fees:
Aosesssd for ligMno !P the City's right-of-way.
This fee cannot be asmsed unt~ ~d~r T.U. El~lc submits
the Ilgh'.ing plan for ~a proposed devetopmem.
Ofloe tf'e :)ler~$ are submiR~, $292,60 per light ~vtli
(100"~ due prl~r to lanai accopt~noe of devdol;ment)
~9,2,22.00 .
Informalton not Available
Street Si~n Fees:
Assessad fo: s~gnage in tho Ctty's riottt-of-v,'~y.
(See at:~chac~ fie cal~s ~ ~l~e)
information not Available
Construction Inspection
A copy of the ~v~cpment conVac~ must ~ submlR~ ~r as~nt.
~ con~ ~ouid ind~e ~ ~st ~ ~t~ct the
~at ar~: Ins~ by the Engine~g De~m~t.
(2% of ~eveJ~ment ~t r~ ~r ~va~ impr~em~[s)
(4% of development cost required for ~ublic impro~en~)
Information not Available.
Page 2
'07/0G/00 14:17 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO, J?6 Q06
.~~o(~.*l~/ou 16:16 F'A.'L 2147307086
ROADWAY XMPACT FEE CALCULATIONS
Pi~OF~.CT:
DATg:
Se~ice Area * I0
* t'Plgure 2. Roadway Im~ct Fee Study)
** CTabk :3 - Roadway ! _.~_. ~t Fee ~mly)
*** ($clxedule 2, l~ge 3- Roadway Impact Pee Sn,dy)
Pe~c~t o~Cfedtt TowaM RoMwn? Impact Pe~ 7~5
To~ Credit S7.7,666.00
214 304 35?0
· '07/06/00 14:15 CITY OF COPPELL ENGINEERING ~ CITY OF' COPPELL NO.~?6
McFADDEN AND MILLER, INC. ~ 4010