Loading...
Park West CC(17)-CS000613 '(~7/~6/00 14:15 CitY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.376 ~02 ~ .__..__~6,._:!0/00 i6:13 F~ 21~7307085 ~LFF ~5SOCl^'l~S ~002/005  COI~ELL,'TT-X,~ 750~9 ,... i,/; ;F D&vid Littl~o-, P.E. Halff Associates, ~c. 8616 Northwest Plaza Drix. e Dallas, TX 75225 JUN ] 5 ZOO0 Haiff A:sociatec.: :.. RE: Pn~k West Commer~ C~t~r, Lot 3a. Block 8 Fee Assessmeut Letter P.O. I~ 478 C, opp~L Texas 7'5019 .June t3, 2000 Dc~r Mr. Lit~laon: Enclosed :s a copy of the City of Coppell Development Fee Assessment table, along with a copy of .he D~vclopmcol F~e calculi'ions for thc referenced dcvclopment. Plea.~e make payment to thc City of Coppell in tho amount oir~ and forward to dxc Finance Department along with a copy ofih~ Fee Assessment table. This amount is a portion of the LS~es~ed i'e~ that need to be paid prior to Colmcii approval. ALso provide a copy of fire En~er's eStimate or c~nWacl to our office $0 the construction impection fee can be verified. Providing a copy of you~ paid receipt to the Enginccriag Deparimmt VOl] help us to :,erify the payment o£ tcquit~ fees and instuc a su~essful beginning of this project. We look fomard to wotklng v, ith }ou an this project_ If you have any questions, please contact m Sincerely, tient M, Collins, Civil CC: l¢-miffr Armstrong, Finance Director D,:bbic [nlpam, Secretary Gler~ Hollowell, Assistant Director of Public Works G~e8 Jon~, Chief i~itdi~'g Official Guy Sims, Dii~i~of L~isure Servicea '07/~/00 14:16 CITY OF' COPPELL ENGINEERING -+ CITY OF COPPELL u~, /~,uu ze~;,t-i r~A -"147~itTull'~ IIALFF A$$0(~IATE$ DEVELOP~NT FEE TABLE ~YoJect: Park West Cona~er~e C~nt~r, Lot Date: TOTAL AMOITNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Wa~,r ~ .mp.~t Fee $7,2~0.00 $7.200.00 (100~ a~e prior m Co,,~_.il Ap~wv~) ,, Water Tap Inzp~tion Fee $100.00 (100~ due at Issuance of Water Meter) Water Meter Fee (Domestic) $1~.0~ (100~ d.~ at lssaznc~ o,f Wator Meter) Water M,~:r Fee (ln'i~ation/Fireli~) $i92.05 (100 ~,.due at Is suanc~ of Water M~ter) Water Meter Deposit (Dew. est*c) (100~ due at ls~oance of Water Meter) lr~igat/on/Firdme Meter Deposit ...... $~0.00 (~00~ ..d?e nt I~uan~e of Water Meter) Watt, water Impact Fee $3,600.00 $3,600.00 (10~t due prior to ¢~1 W~t~.'ater Tap I~t~ct/on Fee SS0.00 (~0~ % d'ae a~ lszuance of Build/n~ Pmni0 Utility F~nnl ln.~pection Fee $50.00 ,, (10C ~_~.ue at l~ua~¢ of Buildiag.l~rmi0 Park Fee ~0,00 ~.00 (10C'55 due prior to Coune. il Approv$1) Roadway Impact F~ $9,222.00 $9,2~,,00 (I00'5~ due prio~ to Cou~il Approval) S~"~t Light F~e Information not Availabl~ Strut Sign Fee I~formation not Awilab]e (1o0,,~..~_~ prior to ~¢c.~p~ of Pro~.~ Construction L~p~tioa Fee Mformation not Available TOTAL AMDU.~ DUE PRIOR TO ~OUNCII, APPRO~i~'-~ $20,022.00 '09/86/00 ld:16 CITY Of COPPELL ENGINEERING a CITY Of COPPELL NO. 3?6 ~ DEVELOPMENT FEE WORKSHEET PROJECT: p~rk Wen Commerc~ Cedar, [,or 3R INoek 8 DATE: Irrigatior, Meter(s): Flmlina I - 2 InCh = 6 EaU'a 1 - 2 k~h = 6 ESU's 0 = -- 0 ESU'e 0 -- 0 ESU's Total ~: 16 ESU's · rdSO.O0 ea. ~ua ~ to Council el~roval of the final Water Tap Jas.oecfion Fee: To~l #: 2 Connectlm~ (~ S.50.00 ea. (Single farrfly due prior t~ issuem:e of building I~"mit) (All other develo(~l duo prior to isshanco of meter) Domestic Water Meter Fee: T~tal #? 1 Domestic Meter(s) ~ $192.05 (~i~gte fin',~ due prior to issuance of building ~ (All omer Cevelooments clue msor to mscance of motel') Irrigatlon/Ft~line *6afar Meter Fee: Total #: 1 Irrigstlo~ Meter(s) 4~ $102.05 Tc~al #: 0 Additlollal IFrioation Mot~'(e) {~ ~ Tctal #: ~ Fire#fi® MoMr(s) ~ SO.O0 (100/, due prk~ t~ issuer~e of wator motors) Domestic Water Meter Deposit Fee: Tc.ta~ #; 1 Meto*(o) ~ $35.00 ea. (1 ~o% due prior to i~suence of wate~ meters) irriptlon/Flre Meter Deposit Fee: TC:~ #: 1 Meter(e) ~ S30.00 aa. (lO~ue prior to J~uonce of water metes] Wutewater Impact Fee: T¢,t~l Domestic Meters ESU'$: 6 ~ S4~0.00 ea. Wastewater Tap lnsi~ectioo Fee: Total #- 1 Connections ~ $~0.00 aa, (100% clue prior tO iSsuaql;o of buli{~ing permit) LTtllit7 Final lnapectJou Fee (AH developments)** Toted #: 1 Lots ~) S60.00 ga. (100% dun p~or to issuance of building j~'rrdt) $?,200.00 $1O0OO $19205 .... $102.05 $~.00 $36.00 S30.00 Page '07/06/00 14:16 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO. 3?6 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * prel;mlnaryp!st approved: 0 0 _ ~ir~le-family I~ ~0.00 ~ lot Multi.family ~ ~.00 per unit (~0% paid prl~' to Council approval of final plat) (50% oaicl at is~onM of twlMIng permit) Roadway Impact Fee: (85e e~,~Ghed fie GBIO~I~Qns) Street Lighting Fees: Aosesssd for ligMno !P the City's right-of-way. This fee cannot be asmsed unt~ ~d~r T.U. El~lc submits the Ilgh'.ing plan for ~a proposed devetopmem. Ofloe tf'e :)ler~$ are submiR~, $292,60 per light ~vtli (100"~ due prl~r to lanai accopt~noe of devdol;ment) ~9,2,22.00 . Informalton not Available Street Si~n Fees: Assessad fo: s~gnage in tho Ctty's riottt-of-v,'~y. (See at:~chac~ fie cal~s ~ ~l~e) information not Available Construction Inspection A copy of the ~v~cpment conVac~ must ~ submlR~ ~r as~nt. ~ con~ ~ouid ind~e ~ ~st ~ ~t~ct the ~at ar~: Ins~ by the Engine~g De~m~t. (2% of ~eveJ~ment ~t r~ ~r ~va~ impr~em~[s) (4% of development cost required for ~ublic impro~en~) Information not Available. Page 2 '07/0G/00 14:17 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO, J?6 Q06 .~~o(~.*l~/ou 16:16 F'A.'L 2147307086 ROADWAY XMPACT FEE CALCULATIONS Pi~OF~.CT: DATg: Se~ice Area * I0 * t'Plgure 2. Roadway Im~ct Fee Study) ** CTabk :3 - Roadway ! _.~_. ~t Fee ~mly) *** ($clxedule 2, l~ge 3- Roadway Impact Pee Sn,dy) Pe~c~t o~Cfedtt TowaM RoMwn? Impact Pe~ 7~5 To~ Credit S7.7,666.00 214 304 35?0 · '07/06/00 14:15 CITY OF COPPELL ENGINEERING ~ CITY OF' COPPELL NO.~?6 McFADDEN AND MILLER, INC. ~ 4010