Loading...
Park West CC(17)-CS000510DEVELOPMENT FEES PROJECT NAME: ENGINEER: 3RIGINATION DATE: Park West Commerce Ctr. Bldg 3, Lot 3R, BIk 8 (Phase II) Halff Associates 5110/00 SENT 6/13/00 6/13/00 6/13/00 8/15/00 8/29/00 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection 2% Grading Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ASSESSED FEE AMOUNT PAID DATE $7,200.00 $7,200.00 7/6/00 $3,600.00 $3,600.00 7/6/00 notify street dept. $6,980.00 $6,980.00 7/6/00 $1,100.00 $1,100.00 5/10/00 $9,222.00 $9,222.00 7/6/00 $240.00 $240.00 8/22/00 $120.00 $120.00 9/15/00 $100.00 $100.00 7/6/00 $50.00 $50.00 7/6/00 $192.05 $192.05 7/6/00 $192.05 $192.05 7/6/00 $35.00 $35.00 7/6/00 $30.00 $30.00 7/6/00 $50.00 $50.00 7/6/00 TotalFees Fees Paid Amount Owed $29,111.10 $29,111.10 $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.