Loading...
Park West CC(17)-CS 990505COPPELL UTILITIES DMSION DATE: TIME: TO: FROM: RE: Listed below are Utility Division comments 1. ;%11 OK. Larry Davis, Construction Inspector Danny Hightower, Utilities Division Follow-up Walk-Thru Park West Com., Lot 8, Blk. 3R relative to walk thru. e e MESSAGE CONFIRMATION 05/06/99 09:13 IDzCITY OF OOPPELL DATE 05~06 S,R-TIME DISTANT STATION ID MODE PAGES 00'20" CITY OF COPPELL CALLING 01 RESULT OK 0000 C~OPPEL~ UTILITIES DIVISION MEMORAND~ April 19, 1999 Larry Davis, Construction Inspector Gary Price, Utilities Division Walk-thru for Park West Commerce, Lot 8, Blk 3R Listed below are Utility Division comments relative to walk thru. .T~ Stencil curb for fire hydrant. .~/Traffic button wrong-buttons off-center for fire hydrant. ~ North side fire hydrant bad gasket. .~ Adjust valve stack on south side of building. 5~.' Paint fire hydrant on west side of building. Need caps and top to fit fire hydrant wrench. Test valve caps in vaults. .~"-Expose 2" dome for by-pass valves. ~ Raise manhole to ground level. ~ Grout around in-flow pipe. ~A'i. No rain pan and cb4mney seal. ~ 2" irrigation meter leaking. ~/~ To: Fl'om: MEMORANDUM Doug S~vens, l~.n~neeri~g Technician Olean Hollowell, Director of Public Work~ Greg Jones, Cl~ief Bui!di~.~o Official WALK-THRU for Park West Comrma~e Center, Lot 8, Block 3R Apr~ ~3, ~999 A final walk-thru for paving stat uti!it/es on the referenced project Ires been sc. laxiuled for Monday, April 4~, 1999 at ~ a.m. If I can be of fui~er assmance please let me know. cc: Lee Stone, Building Inspections Jimmy Laxon, McFadden & Miller