Park West CC(17)-CS 990505COPPELL UTILITIES DMSION
DATE:
TIME:
TO:
FROM:
RE:
Listed below are Utility Division comments
1. ;%11 OK.
Larry Davis, Construction Inspector
Danny Hightower, Utilities Division
Follow-up Walk-Thru Park West Com., Lot 8, Blk. 3R
relative to walk thru.
e
e
MESSAGE CONFIRMATION
05/06/99 09:13
IDzCITY OF OOPPELL
DATE
05~06
S,R-TIME DISTANT STATION ID MODE PAGES
00'20" CITY OF COPPELL CALLING 01
RESULT
OK 0000
C~OPPEL~ UTILITIES DIVISION
MEMORAND~
April 19, 1999
Larry Davis, Construction Inspector
Gary Price, Utilities Division
Walk-thru for Park West Commerce, Lot 8, Blk 3R
Listed below are Utility Division comments relative to walk thru.
.T~ Stencil curb for fire hydrant.
.~/Traffic button wrong-buttons off-center for fire hydrant.
~ North side fire hydrant bad gasket.
.~ Adjust valve stack on south side of building.
5~.' Paint fire hydrant on west side of building.
Need caps and top to fit fire hydrant wrench.
Test valve caps in vaults.
.~"-Expose 2" dome for by-pass valves.
~ Raise manhole to ground level.
~ Grout around in-flow pipe.
~A'i. No rain pan and cb4mney seal.
~ 2" irrigation meter leaking.
~/~
To:
Fl'om:
MEMORANDUM
Doug S~vens, l~.n~neeri~g Technician
Olean Hollowell, Director of Public Work~
Greg Jones, Cl~ief Bui!di~.~o Official
WALK-THRU for Park West Comrma~e Center, Lot 8, Block 3R
Apr~ ~3, ~999
A final walk-thru for paving stat uti!it/es on the referenced project Ires been sc. laxiuled for
Monday, April 4~, 1999 at ~ a.m.
If I can be of fui~er assmance please let me know.
cc: Lee Stone, Building Inspections
Jimmy Laxon, McFadden & Miller