Loading...
Park West CC(1)-LR 900425DALLY FIELD REPORT PROdECT: Park West Commerce Center, Site No. 1 CLIENT: Prentiss P~operties REPORT DATE: q~25-~ .......... P~0JECT NO,: 5603 REvIEwED I)¥._._ BRIEF 0ESCRIPTION AND LOCATION:~i~~,,~.~_o.'~ ~o¢%c.. _. TIME: START WORK: I:~ STOP WORK: ~:~% ..... DELAYS: WORK PERFORMED· · THE FOLLOWING ITEMS WERE 08SERV[D OR CHEC.KEO DURING THIS INSPECTION: (CHECK (v') APPROPRIATE RESPONSE- ASTERISK RESPONSE:REOUIRES COMMENT I. PIE. R. INSPECTION / FOUNO/~TION 2. CONCRETE INSPECTION 3. SUB-SURFACE DRAIN INSTALLATION ,I. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION ~"~. GENERAL INSPECTION * ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) <3. TIE-BACK INSPECTION ' )- IO:-FIE-I~D'DENSITY TESTING Il. CONCRETE CYLINDER IZ. GROUT CU8ES 13. FIELD GRADATION/LiME 14. FIELD REPORTS 1.5. FIELD SAMPLING -X 16. TENDON,' PROOF LOAB INSPECTION 17. PIER INSPECTION/RETENTiON 18. SEE ATTACIIED SI-mE{TS FOR TEST RESULTS REPORT NO.: Mason-Johnston & Assoc., Inc. Tr ansmitt~ ~ Date: To: Prentiss Properties Attn: Mr.. Lee Hansen Project: Park West Commerce Centerr Site No. 1 Gentlemen: Mason-Johnston & Assoc., Inc. transmits herewith the following: ~,'/?~ ~/~ /7 ~_~'~ /_~z~? W~ . ,- / cc: Larry Davis, COC Russell Doyle, COC Dale Jackson, COC Paul Driscoll, H&W Paul Maute; HMBH Gary McHale, BDD Don Davis, D.D. Sincerely yours, Herbert C. Crowder Mason-Johnston & Assoc., Project No. 5603 I~lc.