Park West CC(1)-LR 900424DALLY FIELD REPORT PROJECT: Park West Commerce Center, Site No. 1 CLIENT: Prentiss P~operties REPORT OATE :_~2_.~ ~-_~__ . __ P~OJECT NO. TECHNICIAN: REVIEWED BY 5603 BRIEF DESCRIPTION AND LOCATION: .WEATHER: ~ou~ DO~ TIME: START WORK: ~:OO ~ STOP WORK: ~:OO p. DELAYS:. WORK PERFORMED THE FOLLOWING ITEMS WERE 08SERVED OR CHECKED DURING THIS INSPECTION: (CHECK (v~) APPROPRIATE RESPONSE- ASTERISK RESPONSE REOUIRES COMMENT I. PIER INSPECTION/FOUNDATION 2_. CONCRETE INSPECTION 3. SUB-SURFACE DRAIN INSTALLATION 4. SELECT FILL PLACEMENT 5. LIME STABILIZATION 6. FOOTING INSPECTION 7. GENERAL INSPECTION 8. REINFORCEMENT STEEL INSPECTION 9. TIE-BACK INSPECTION REMARKS: ( ) IO. FIELO DENSITY TESTING (v"~ II. CONCRETE CYLINDER('p;~-~.-w¢~ 12_ GROUT CUBES 13. FIELD GRADATION/ LIME 14. FIELD REPORTS 15. FIELD SAMPLING ~. 16. TENDON/PROOF LOAD INSPECTION 17. PIER INSPECTION/RETENTION 18. SEE ATTACHED SHEETS FOR TEST RESULTS REPORT NO.: