Park West CC(1)-LR 900424DALLY FIELD REPORT
PROJECT: Park West Commerce
Center, Site No. 1
CLIENT: Prentiss P~operties
REPORT OATE :_~2_.~ ~-_~__ . __
P~OJECT NO.
TECHNICIAN:
REVIEWED BY
5603
BRIEF DESCRIPTION AND LOCATION:
.WEATHER: ~ou~ DO~
TIME: START WORK: ~:OO ~ STOP WORK: ~:OO p.
DELAYS:.
WORK PERFORMED
THE FOLLOWING ITEMS WERE 08SERVED OR CHECKED DURING THIS INSPECTION:
(CHECK (v~) APPROPRIATE RESPONSE- ASTERISK RESPONSE REOUIRES COMMENT
I. PIER INSPECTION/FOUNDATION
2_. CONCRETE INSPECTION
3. SUB-SURFACE DRAIN INSTALLATION
4. SELECT FILL PLACEMENT
5. LIME STABILIZATION
6. FOOTING INSPECTION
7. GENERAL INSPECTION
8. REINFORCEMENT STEEL INSPECTION
9. TIE-BACK INSPECTION
REMARKS:
( ) IO. FIELO DENSITY TESTING
(v"~ II. CONCRETE CYLINDER('p;~-~.-w¢~
12_ GROUT CUBES
13. FIELD GRADATION/ LIME
14. FIELD REPORTS
15. FIELD SAMPLING ~.
16. TENDON/PROOF LOAD INSPECTION
17. PIER INSPECTION/RETENTION
18. SEE ATTACHED SHEETS FOR
TEST RESULTS
REPORT NO.: