Park West CC(1)-LR 900413DAILY FIELD
REPORT
PROJECT: Park West Commerce
Center, Site No. 1
CLIENT: Prentiss PRoperties
REPORT OATE:. ~-13C_~ ........
PROJECT NO.: ..... ~6~
TEC,N,C,^ ....
REVIEWED tIY._._
BRIEF OESCRIPTION AND LOCATION:
.WEATHER: ROA~ ~/.,, ~
TINE: START WORK: 12'-00
STOP WORK: ~:30 p~ .....
DELAYS:
WORK PERFORMED' "
THE FOLLOWING ITEMS WERE 08SERV~[O OR CHECKED DURING THIS INSPECTION:
(CHECK (v") APPROPRIATE RESPONSE - ASTERISK RESPONSE: RI~OUIRES COMMENT
I. PIER. INSPECTION / FOUND.,~TION ' )- IO.'-FIEED'DENSITY TESTING
Z. CONCRETE INSPECTION
3. SUB-SURFACE DRAIN INSTALLATION
4_ SELECT FILL PLACEMENT
S. LI~E STABILIZATION
G. FOOTING INSPECTION
?. GENERAL INSPECTION K-
B. REINFORCEI'..,IENT STEEL INSPECTmON
9. TIE-BACK INSPECTION
I I. CONCRETE CYLINDER
12. GROUT CUBES
13. FIELO GRADATION /
I,q_ FIELD REPORTS
IS. FIELD SAMPLING -X
16. TENOON/PROOF LOAD INSPECTION
~7. PIER INSPECTION/RETENTION
lO. SEE ATTACHED SHEETS FOR
TEST RESULTS
RE POR1- NO.: