ST9301-CS 921009DALLAS COUNTY PUBLIC WORKS October 9, 1992 Mr. Phil Weston, P.E. Senior Project Manager Sverdrup Corporation 4311 Oak Lawn, Suite 300 Dallas, Texas 75219 Re: Sandy Lake Road, Project 91-830 (Mac Arthur Blvd to Coppell City Limits) Pre-Design Meeting and Notice to Proceed Dear Mr. Weston: On October 8, 1992, the Pre-Design meeting was held for the subject project at the Public Works Department, 411 Elm St. Attached are the minutes from this meeting and a list of the attendees. Please advise me, in writing of any item that does not meet with your understanding of the meeting and provide certificates of your required insurance coverage. High density disks containing the county'standard design sheets, right-of-way plat sheets, and asample set of contract documents and proposal (in Word Perfect) along with a blue line hard copy of each sheet will be available shortly at a nominal cost. I'll call when its ready. This letter, serves as your notificationto proceed with the design of this project. Please call if you have any questions regarding this project at 653-7153. Sincerely, BEJ:ehd ~..~L/ ~achme~ts ~/cc: Mr, Ken Griffin, P.E., City of Coppell Mr. Dan Saldana, P.E., Dallas Water Utilities xc: T.R. Kennedy, Assistant Director File ~ 830: 91830P-D. ltr 411 Elm Street Dallas, Texas 75202 653-7151 SANDY LAKE ROAD PROJECT 91-830 (MAC ARTHUR BLVD TO COPPELL CITY LIMITS) PRE-DESIGN MEETING OCTOBER 8, 1992 DESIGN ISSUES - PAVING Provide 4 separate top of curb grades Prop. Right Top of Curb, Prop. Right Median Top of Curb, Prop. Left Top of Curb and Prop. Left Median Top of Curb. 2. Minimum gradient to be used is 0.50%. The outside curb grades should be set approximately six inches below the ground line at the right-of-way line. Ponding of storm water on private property is to be avoided. Typical roadway section will consist of 2-24 foot roadways (face to face of curbs) separated by 42 foot median with 10 foot parkways. The 42 foot wide median permits future widening to 2-37 foot roadway separated by a 16 foot median. This section should be verified with the City of Coppell. The roadway will consist of 8-inch reinforced concrete pavement on a 6-inch, 6 percent lime stabilized base with 6- inch monolithic integral curbs. The concrete pavement strength required shall provide a min. average flexural strength of 650 psi. Driveways will be of 6-inch reinforced concrete from the back of curb to the property line. They will match in-kind the material back of the property line. City of Coppell driveway standards are to be used. Existing utilities shall be shown in both plan and profile on the paving and drainage sheets. 80 Alignment of right-of-way and roadways at the eastern end to be coordinated with Charles Gojer, P.E., Gojer & Associates, Inc. who will be working on the section east of the Coppell City Limits. Left turn lanes are to be provided at all street intersections, driveways which are major traffic generators and at other locations to be determined by the city/County. DESIGN ISSUES - DRAINAGE 1. According to Ken Griffin, city Engineer for Coppell the City of Dallas drainage design criteria should be used on this project. Sandy Lake Road Project 91-830 Pre-Design Conference The mainline trunk for the storm sewer system is to be generally located under the pavement on the side of the roadway which has the greatest contributing drainage area. The design of the mainline system should however take into consideration conflicts with existing underground utilities and construction sequencing. Box culverts, if needed, will be set up for alternate bids (pre-cast or cast in place) in the bid documents. Lateral storm sewer lines in general shall connect to the maintrunk at the spring line at a 60 degree angle. DESIGN ISSUES - GENERAL 1. Specifications will be TxDOT standard specifications for construction except for city water and sanitary sewer which will be NCTCOG. 2. DWU benchmarks should be used but coordinated with Coppell. UTILITIES City of Dallas Water Utilities has indicated that they serve the City of Coppell and have a 60 inch steel line & 30" pretensioned concrete distribution line in Sandy Lake Road. Consultant is free to contact Daniel Saldana about the existing plans on this and any proposed design that may be underway at 984-4620. A new 60-72 inch distribution line 30 ft north of the existing 60 inch steel line is in the early design stages. Feel free to contact Joe Carter, P.E. with Shimek, Jacobs and Finklea at 361-7900 about their design. consultant is responsible for contacting utilities and requesting on site meetings as needed for assistance in accurately locating their facilities both horizontally and vertically. e DWU stated that if relocation/adjustment of their 30 inch or 60 inch distribution line was required that it could only be done in the winter and that the line could not be out of service for more than 12 hours. Se Consultant should contact the City of Coppell City Engineer, Ken Griffin at 393-1016 to determine what utilities may be involved and which ones are franchised utility companies. Sandy Lake Road Project 91-830 Pre-Design Conference RIGHT-OF-WAY In general right-of-way is expected to be obtained equally from both sides of the project to provide a 110 foot wide right-of-way unless, because of existing topographic features it is more economical to acquire more ROW from one side than the other. The need for drainage easements, slope easements and construction easements should be clearly shown by the consultant. CITY ISSUES What amenities does the City of Coppell wish to be included in this project and are they able to be funded by the City, Landscaping, sidewalks, traffic signals, right turn lanes, street lighting, city utility betterment work, traffic markings, etc. The City of Coppell indicated they would want their standard drawings used with this project which would include brick pavement at crosswalks and barrier free ramps. Coppell requested that the pavement be extended through the intersection of Mac Arthur. The pavement should be extended 200 ft to the W. of the W. property line of Mac Arthur and appropriate temporary pavement transition provide W. of the end of the pavement. Coppell indicated that traffic signal conduit and possibly street lighting conduit will probably be needed. Also, sprinkler system will be required. The City of Coppell will be responsible for the design of sprinkler system and providing information on the locations for signal and lighting conduit. o City of Coppell was advised that they would be responsible for design of any water and sanitary sewer relocations/adjustments. CONTRACT ADMINISTRATION 1. Consultant should become familiar with all provisions of the contract with Dallas County. 2. Contract is between the Consultant and Dallas County· No other agency is authorized to give directives or to approve payment of invoices. Sandy Lake Road Project 91-830 Pre-Design Conference ® Consultant shall provide Dallas County with copies of any correspondence with other public agencies and utility companies relative to the engineering design of this project. A Design Progress form and Bar Graph Schedule needs to be prepared and updated monthly. ® Partial fee payments will be made as stipulated in the contract. Substantial and complete documentation will be required before payment can be considered. Proposed alignment study, preliminary paving profiles and preliminary drainage area map must be submitted before the first incremental invoice will be considered for payment. Insurance certificate for errors and omissions coverage need to be submitted. File i 830: 91830P-D. T ' '1' I I 'l I