Loading...
Park West CC(1)-CS 881221The City With A Beautifu RO Box 478 Coppell, Texas 75019 214 - 462 - 0022 December 21, 1988 Mr. Brent Wicker Wicker & Associates Commercial Real Estate 1503 Dallas Parkway Suite 940 Dallas, Texas 75248 Dear Mr. Wicker: This letter is in response to your request that we provide you with the availability of water and sewer in and around Gateway Park Development. WATER MAINS There are two (2) 16 inch Water Mains feeding this area from the North (Bethel Road) along Freeport Parkway and Coppell Road. There are also two (2) 10 inch water mains feeding the area from the north and east along Denton Tap Road and Belt Line Road East/West respectively. SANITARY SEWER As we discussed, we also have under contract a 24 inch Water Transmission line that will be placed along Southwestern Boulevard from Belt Line Road East/West to the existing elevated storage tank to the west. There is an existing 12 inch line servicing the west and north central areas of the Gateway Park area draining easterly along the St. Louis and Southwestern Railroad right-of-way. Also a 15 inch sewer drains the easterly part of the development (and other areas) draining easterly along Belt Line Road East/West. continued../2 In regard to a 24 inch Sanitary Sewer draining into a 12 inch sewer; in discussing this matter with George Preul, of Albert Halff Associates, that 24 inch sewer was sized and put in place with the construction of Freeport Parkway. From just that discussion, there is a need in the future for additional sanitary sewer trunklines to service the area when "fully developed". The two trunk lines (12 inch and 15 inch) servicing the area are in place and that capacity is available now. As we discussed Half & Associates, as the Design Engineers, should be able to address the specifics on capabilities and development phasing. I hope this information suffices for your purposes at this time. If you need any more information, please let me know and we will sure continue to work with you on the development of this tract. Thank you. Sinc?./e~y, RRD:kg xc: Alan D. Ratliff, City Manager Steve Goram, Director of Public Works Taryon Bowman, Planning & Zoning Coordinator Kevin Peiffer, Ginn Inc. Pat Acker, Albert Halff Associates BRENTWIC: l//