Park West CC(1)-CS 861201 ENGINEER
or
CONSULTANT:
Albert Halff & Associates
c/o Mr. Pat Acker
8616 Northwest Plaza Drive
Dallas, Texas 75225
Page 6
2nd Review of:
Gateway Park at Coppell
ENGINEERING: Contact Shohre Daneshmand @ 462-0022 1) Delineate the project's name on the "Concept Plan".
2) Streets pavement width and R.O.W. do not meet City's
standard (Min. street R.O.W. is 50').
3) Water and Sewer Utility not clear.
4) Preliminary Plat is accepted.
BUILDING INSPECTION:
No Comment.
FIRE:
1)
2)
3)
Fire hydrants required every 300 feet.
Fire hydrants and water system must be operational
before construction begins.
Required Fire Hydrants 300' Spacing:
a. S. Belt Line Road
b. Cowboy Drive
LONE STAR GAS:
No representative was present.
GENERAL TELEPHONE:
Preliminary plat is acceptable with the following
stipulation:
1) Need 10' easement along Cowboy Drive (north
side).
COPPELL CABLEVISION: 1) Outside service area.
2) No plans at present time - but a good chance in the
future to provide service here .
3) A 2' sleeve under streets would be nice.
U.S. POSTAL SERVICE:
No representative was present.
DEVELOPMENT INSPECTOR:
No Comment.
TEXAS POWER & LIGHT:
Need to meet with Glen Fabian of Texas Power & Light to
work out details, preliminary Plat does not provide
easement for all existing facilities. Contact Glen
Fabian at 888-1382.
Page 7
PARKS AND RECREATION:
No Comment.
PUBLIC WORKS:
Unable to obtain comments from Public Works - please
contact Steve Goram, Director of Public Works at
462-0022.
PLANNING AND DEVELOPMENT:
1) Revisions must be submitted by 3:00 p.m., on Monday,
December 15, 1986 to be eligible for December 18,
1986 Planning and Zoning Commission action. Please
submit 22 copies and 3 reductions.
2) This item is tentatively scheduled for December 18,
1986 Planning and Zoning Commission action.
3) Please submit a written response to all comments
when corrections are returned.