Loading...
Park West CC(1)-CS 861201 ENGINEER or CONSULTANT: Albert Halff & Associates c/o Mr. Pat Acker 8616 Northwest Plaza Drive Dallas, Texas 75225 Page 6 2nd Review of: Gateway Park at Coppell ENGINEERING: Contact Shohre Daneshmand @ 462-0022 1) Delineate the project's name on the "Concept Plan". 2) Streets pavement width and R.O.W. do not meet City's standard (Min. street R.O.W. is 50'). 3) Water and Sewer Utility not clear. 4) Preliminary Plat is accepted. BUILDING INSPECTION: No Comment. FIRE: 1) 2) 3) Fire hydrants required every 300 feet. Fire hydrants and water system must be operational before construction begins. Required Fire Hydrants 300' Spacing: a. S. Belt Line Road b. Cowboy Drive LONE STAR GAS: No representative was present. GENERAL TELEPHONE: Preliminary plat is acceptable with the following stipulation: 1) Need 10' easement along Cowboy Drive (north side). COPPELL CABLEVISION: 1) Outside service area. 2) No plans at present time - but a good chance in the future to provide service here . 3) A 2' sleeve under streets would be nice. U.S. POSTAL SERVICE: No representative was present. DEVELOPMENT INSPECTOR: No Comment. TEXAS POWER & LIGHT: Need to meet with Glen Fabian of Texas Power & Light to work out details, preliminary Plat does not provide easement for all existing facilities. Contact Glen Fabian at 888-1382. Page 7 PARKS AND RECREATION: No Comment. PUBLIC WORKS: Unable to obtain comments from Public Works - please contact Steve Goram, Director of Public Works at 462-0022. PLANNING AND DEVELOPMENT: 1) Revisions must be submitted by 3:00 p.m., on Monday, December 15, 1986 to be eligible for December 18, 1986 Planning and Zoning Commission action. Please submit 22 copies and 3 reductions. 2) This item is tentatively scheduled for December 18, 1986 Planning and Zoning Commission action. 3) Please submit a written response to all comments when corrections are returned.