Loading...
Parks Coppell-CS 930825PUBLIC WORKS lVII~VIORANDIJlVl DATE: TO: FROM: August 25, 1993 Garreth Campbell, Construction Inspector Howard L. Pafford, Utilities Superintendentx~ Water/Sanitary Sewer Punchlist - The following items remain deficient on this project and should be corrected prior to ay~k B - The chimney seal is loose at the bottom. Improper ~ t/~x~ installation. Contractor raised manhole to accomm ole 2. The screening wall contractor will need to complete wall and set final grade in right-of-way so that all water/wastewater components are at grade and accessible. Three existing manholes on Heartz are covered. Please have the contractor contact staff when all items have been corrected. This project should not be accepted until all punch list items are corrected. WALKTHRU.HLP/PRKCOPL. HLP