Loading...
ST9301-CS 911011October 11, TO: FROM: SUBJECT: NI~O~U~ Alan D. Ratliff, City Manager Frank Trando, Deputy City Manager/Finance Director~ Engineering Study for Sandy Lake Road As you are aware, in September of this year we issued bonds and on the 26th we actually received the funds. At the present time I am not sure who should actually be in charge of the Sandy Lake Engineering Project, whether it be Public Works or the EngineeringDepartment. I think that we should proceed with the selection of a consultant engineer to complete the design work, although we may want to consider waiting to see what the County does with their bond election before actually designing the project. We might consider allowing the County to design the entire road with the City's financing. FT/lr I 4 1991 By: Engineering SNDYLKRD.001 ~' 'T I 'l !