Loading...
RC Townhomes-CS041214COPPELL December 14, 2004 Jason R. Rose 410 Spinnaker Drive Allen, TX 75013 RE: Riverchase Townhouse Addition ,~ffevi~ed [ree Assessment Letter Dear Mr. Rose: Enclosed is a copy of the City of Coppell Development Fee Asscssmeot table, along witb a copy of the Development Fee calculations for the referenced development. This revised impact fee assessment is a result of an agreement reached with the Fire Marshal for an alternate design for the building sprinkler systems. The single larger meter for each building has been replaced with a one-inch meter for each individual unit. This results in a reduction of 12 two-inch fire line meters and their associated fees. The Engineering Department has determined that the additional volume of water that can be drawn through a one-inch meter versus the standard 5/8 inch x ~/h incln meter wiIl only be used during a fire flor, cor~dition, and as such the additional impact fee ,,,.ill be waived for this largcr meter. You ,,``ii1 still be responsible for paying the cost of the more expensive one-inch meter. The fees for water and sewer taps, water meters, and utility inspection fees need to be paid by' separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees ,.``'ill l~elp insure a successful beginning of this project. We look forward to working with you on this project, if you have any quest o ~s, 01case contact me. Sincere]y, Keith R. Marvin, P.E. CMl Engineer cc: Jennifer Armstrong, Finance Director nBeth Spletzer, Administrative Secretary, .B, uilding Inspections Hollowell, Assistant Director of Public \korks Greg .lones, Chief Building Official Brad Reid-.&hirect,x~Parl,:s and R,~cre0tion DEVELOPMENT FEE TABLE Project: Riverchase Townhouse Addition Date: 8/3/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $13,440.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $2,400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,904.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (I 00% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,440.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $13,440.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $2,400.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,400.00 (100% due at Issuance of Building Permit) Park Fee $61,680.00 $61,680.00 (100% due prior to Council Approval) Roadway Impact Fee $41,040.00 $41,040.00 (I 00% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $141,144.96 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $102,720.00 DEVELOPMENT FEE WORKSHEET PROJECT: Riverchase Townhouse Addition DATE: 8/3/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 48 1" = 48 0 = 0 0 = 0 0 = 0 Total #: 48 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 48 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 48 Domestic Meter(s) @ $60.52 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Mater(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 48 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 48 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 48 Connections @ $50,00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 48 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's**Assessed at 3/4" impact ESU's ESU's ESU's $13,440.00 $2,400.00 $2,9O4.96 $0.00 $0.00 $0.00 $1,440.00 SQO0 $13,440.00 $2,400.00 $2,400.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Park Development Zone: 48 Single-family ~ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Zone 2 $61,68O.OO $0.00 $41 ,O4O.OO Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 pe? light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Riverchase Townhouse Addition 8/3/2004 ROADWAY IMPACT FEE: Service Area * 7 Category ** Residential Land Use ** Residential Others Not Specified No. LoB/Units 48 Development Units ** 48.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Deve opment Unit) x (Fee per Vehicle Mile) = $41,040.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)