Loading...
RC Townhomes-CS040804 (2)DEVELOPMENT FEES PROJECT NAME: Riverchase Townhomes ENGINEER: Peebles & Assoc OR G NAT ON DATE: 8/4/2004 REV SED 12/14/04 SENT 8/4/2004 12/14/2004 8/27/2004 12/6/2004 ASSESSMENT Water Impact Fee REVISED Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection Early Grading Permit Overtime Inspection ASSESSED FEE AMOUNT PAID ¢o oAn nn $2,240.00 $13,440.00 $13,440.00 $61,680.00 $61,680.00 rb $41,040.00 $41,040.00 rb DATE 9/20/2005 10/12/2004 2/11/2005 $8,852.40 $8,852.40 rb 10/12/2004 $676.00 $676.00 rb 8/27/2004 $160.00 $160.00 rb 12/15/2004 Water Tap Inspection $2,400.00 Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Firellrrig) Utility Final Inspection []Subtotal to En~. $200.00 cb 6/24/2005 $600.00 cb 7/7/2005 $200.00 cb 9/2/2005 $200.00 cb 6/24/2005 $600.00 cb 7/7/2005 $200.00 cb 9/2/2005 $242.08* cb 6/24/2005 $726.24 cb 7/7/2005 $250.96 cb 9/2/2005 $2,400.00 $2,904.96 $204.34 $1,440.00 $120.00 cb 6/24/2005 $360.00 cb 7/7/2005 · $120.00 cb 9/2/2005 $30 O0 ~-~,~ $2,400.00 ,~ $200.00 cb 6/24/2005 $600.00 cb 7/7/2005 $112,408:40 $112,408.40 $0.00 TOTALS Total Fees Fees Paid Amount Owed $153,307.70 $118,951.92 $34,355.78 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received PHor To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd.