Loading...
Riverside Church-CS 940111COPPELL PUBLIC WORKS MEMORANDUM DATE: January 11, 1994 TO: Ken Griffin, P.E., FROM: Howard L. Pafford, RE: City Engineer Utilities Superintendent Development Fees for Riverside Church of Christ The following fees should be assessed on the above referenced project: Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 1 - 6" Fireline Meter = 2.5 ESU's Total 18.5 ESU's 100% due prior to Council Wastewater Impact Fee: 1 100% $650.00 ea = $12,025.00 approval of final plat. - 2" Domestic Meter = 8 ESU's Total $ ESU's ~ $450.00 ea = $ 3,600.00 due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $100.00 each = $ 300.00 100% due prior to issuance of building permit. Utility Final Inspection Fee 1 lots ~ $50.00/lot = $50.00 ~ ~ 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 2" . Domestic Meters ~ _$205.10 ea 100% due prior = ~ 205.10//~ 2" Irrigation Meter ~ $296.84 ea = $ 296.84 Total = 2~_~.11 to issuance of water meters. Water Meter Deposit 3 meters ~ 435.00 ea = $105.00 100% due prior to issuance of water meters. cc: Steven G. Goram, Director of Public Works Riverside Church of Christ File Building Inspections FEES.CHURCHCH.HLP