Riverside Church-CS 940111COPPELL PUBLIC WORKS
MEMORANDUM
DATE: January 11, 1994
TO: Ken Griffin, P.E.,
FROM: Howard L. Pafford,
RE:
City Engineer
Utilities Superintendent
Development Fees for Riverside Church of Christ
The following fees should be assessed on the above referenced
project:
Water Impact Fee:
1 - 2" Domestic Meter/s = 8 ESU's
1 - 2" Irrigation Meter/s = 8 ESU's
1 - 6" Fireline Meter = 2.5 ESU's
Total 18.5 ESU's
100% due prior to Council
Wastewater Impact Fee:
1
100%
$650.00 ea = $12,025.00
approval of final plat.
- 2" Domestic Meter = 8 ESU's
Total $ ESU's ~ $450.00 ea = $ 3,600.00
due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $100.00 each = $ 300.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee
1 lots ~ $50.00/lot = $50.00 ~ ~
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee
1 - 2" . Domestic Meters ~ _$205.10 ea
100% due prior
= ~ 205.10//~
2" Irrigation Meter ~ $296.84 ea = $ 296.84
Total = 2~_~.11
to issuance of water meters.
Water Meter Deposit
3 meters ~ 435.00 ea = $105.00
100% due prior to issuance of water meters.
cc:
Steven G. Goram, Director of Public Works
Riverside Church of Christ File
Building Inspections
FEES.CHURCHCH.HLP