River Ridge Add-CS 931215December 15, 1993
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Jeff Crandall
CCM Engineering Corporation.
1120 Empire Central Place
Suite 308
[ RE: River Ridge Addition
~ Devei°pmeDe~r Mr. Crand~i:Fee Assessment
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the development fee calculations for River Ridge Addition.
Please provide a check made payable to the City of Coppeil in the amount of $82,7015.03 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee
assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this
project so the construction inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
K~neth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg lones, Building Official
Doug Stevens, Engineering Technician
Date:
Project:
CITY OF COPPELL
DEVELOPMENT FEES
December 15, 1993
River Ridge Addition
TOTAL
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100%due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee
(100%due at Issuance of Building PermiO
Water Meter Fee (Lots)
(100%due at Issuance of Building Permit)
Water Meter Fee (h'rigation)
(100%due at Issuance of Water Meters)
Water Meter Deposit
(100%due at Issuance of Building Permi0
Im'gation Meter Deposit
(100%due at Issuance of Water Meters)
Street Sign Fee
(100%due prior to Acceptance of Projec0
Street Light Fee
(100%due prior to Acceptance of Project)
Park Fee
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROVAL
$ 43,255.OO
$ 6,500.OO
$ 27,450.00
$ 6,100.00
$ 3,050.00
$1,357.25
$186.30
$1,830.00
$ 140.00
$1,325.03
$ 21,350.00
$ 112,543.58
AMOUNT DUE
PRIOR TO
COUNCIL
$ 43,255.OO
$ 27,450.00
-0-
$1,325.03
$10,675.OO
$ 82,705.03
$82,705.03
+ Construction Inspection Fee
(2% of Project Cost due prior to
preconstruction meeting)
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
COPpEr. r. PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
12/8/93
Ken Griffin, City Engine~r%~
Public Works Staff
Development Fees for River Ridge Addition
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
61 - 5/8" x 3/4"
3 - 5/8" x 3/4"
1 - 1"
Total 66.5
Domestic Meter/s =
Irrigation Meter/s = __
Irrigation/Meter/s = __
61 ESU's
3 ESU's
2.5 ESU's
ESU's @ $650.00 ea = $43,225.00
100% due prior to Council approval of the final plat.
Wastewater Impact (city)
61 - 5/8" x 3/4" Residential Meters = 61 ESU's
Total 61 ESU's @ $450.00 ea = $27.450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
65 Connections @ $100.00 each = $6,500.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
61 Connections @ $100.00 each = $6,100.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
61 lots @ $50.00/lot = $3,050.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
61 - 5/8" x 3/4" Residential Meters @ $22.25 ea = $ 1,357.25
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
3 - 5/8" x 3/4" Irrigation Meters @
1 - 1" Irrigation Meter @
Total
100% due prior to issuance of water meters.
$22.25 ea
$62.10 ea
= $ 66.75
= $ 62.10
$186.30
Water Meter Deposit
Residential - 61 meters ~ $30.00 ea = $ 1,830.00
100% due prior to issuance of building permit.
Irrigation
4 meters @ $35.00 ea = $ 140.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
61 Residential Lots at $350.00 each = $21,350.00
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise
If you have
advise.
HLP/dm
cc:
the Developer of these fees and due dates.
any questions regarding these assessments please
Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for River Ridge Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 11 $698.94
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 5 484.25
OTHER
No Outlet (30"; $65.12 2 130.24
No Outlet Blade $11.60 1 11.60
TOTAL 19 $1,325.03
Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP
Revised 12/15/92