River Ridge Add-CS 931215December 15, 1993 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Jeff Crandall CCM Engineering Corporation. 1120 Empire Central Place Suite 308 [ RE: River Ridge Addition ~ Devei°pmeDe~r Mr. Crand~i:Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for River Ridge Addition. Please provide a check made payable to the City of Coppeil in the amount of $82,7015.03 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, K~neth M. Griffin, P.E. City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg lones, Building Official Doug Stevens, Engineering Technician Date: Project: CITY OF COPPELL DEVELOPMENT FEES December 15, 1993 River Ridge Addition TOTAL Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100%due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100%due at Issuance of Building Permit) Utility Final Inspection Fee (100%due at Issuance of Building PermiO Water Meter Fee (Lots) (100%due at Issuance of Building Permit) Water Meter Fee (h'rigation) (100%due at Issuance of Water Meters) Water Meter Deposit (100%due at Issuance of Building Permi0 Im'gation Meter Deposit (100%due at Issuance of Water Meters) Street Sign Fee (100%due prior to Acceptance of Projec0 Street Light Fee (100%due prior to Acceptance of Project) Park Fee (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 43,255.OO $ 6,500.OO $ 27,450.00 $ 6,100.00 $ 3,050.00 $1,357.25 $186.30 $1,830.00 $ 140.00 $1,325.03 $ 21,350.00 $ 112,543.58 AMOUNT DUE PRIOR TO COUNCIL $ 43,255.OO $ 27,450.00 -0- $1,325.03 $10,675.OO $ 82,705.03 $82,705.03 + Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPpEr. r. PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: 12/8/93 Ken Griffin, City Engine~r%~ Public Works Staff Development Fees for River Ridge Addition The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 61 - 5/8" x 3/4" 3 - 5/8" x 3/4" 1 - 1" Total 66.5 Domestic Meter/s = Irrigation Meter/s = __ Irrigation/Meter/s = __ 61 ESU's 3 ESU's 2.5 ESU's ESU's @ $650.00 ea = $43,225.00 100% due prior to Council approval of the final plat. Wastewater Impact (city) 61 - 5/8" x 3/4" Residential Meters = 61 ESU's Total 61 ESU's @ $450.00 ea = $27.450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 65 Connections @ $100.00 each = $6,500.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 61 Connections @ $100.00 each = $6,100.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 61 lots @ $50.00/lot = $3,050.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 61 - 5/8" x 3/4" Residential Meters @ $22.25 ea = $ 1,357.25 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 3 - 5/8" x 3/4" Irrigation Meters @ 1 - 1" Irrigation Meter @ Total 100% due prior to issuance of water meters. $22.25 ea $62.10 ea = $ 66.75 = $ 62.10 $186.30 Water Meter Deposit Residential - 61 meters ~ $30.00 ea = $ 1,830.00 100% due prior to issuance of building permit. Irrigation 4 meters @ $35.00 ea = $ 140.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 61 Residential Lots at $350.00 each = $21,350.00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise If you have advise. HLP/dm cc: the Developer of these fees and due dates. any questions regarding these assessments please Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for River Ridge Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 11 $698.94 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 5 484.25 OTHER No Outlet (30"; $65.12 2 130.24 No Outlet Blade $11.60 1 11.60 TOTAL 19 $1,325.03 Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 12/15/92