Loading...
Gibbs Station 1-CS 920730~!he City With A Beautiful Future July 30, 1992 Mr. Sam Wise Heath & Knight ~~rlt .... P.O. Box 478 'J ~ - '~9~* Coppell, Texas 75019 ~ 214-462-0022 Dear Mr. Wise: Enclosed is a copy of the City of Coppeli Development Fee Assessment list dated 7/30/92, along with a copy of the development fee calculations for Gibbs Station Phase I, dated 7/29/92. Please provide a check made payable to the City of Coppell in the amount of $106,615.97 and forward it to Mr. Alan Johnson, Finance Depa~'tment, along with a copy of the fee assessment list. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact M. Shohre Daneshmand, P.E. or myself. Sincerely, City Engineer KIVIG/MSD/bd Steve Goram,Director of Public Works Alan lohnson, Assistant Finance Director C-reg Sones, Acting Building Official Gary L. Sieb, Director of Planning and Community Services Larry Davis, Construction Inspector M. Shohre Daneshmand, P.E., Civil Engineer Bill Anderson, P.E., Dan M. Dowdey & Associates CITY OF COPPELL DEVELOPIVIENT FEES Date: Project: July 30, 1992 Gibbs Station Phase I (97 Residential Lots) TOTAL ASSESSMENT AMOUNT DUE PRIOR 8/14/92 Park Fee (50% payable prior to Council Approval) (50% payable with Building Permit) $ 14,550.00 $ 7,275.00 Water Impact Fee (100% due prior to Council Approval) $ 63,050.00 $ 63,050.00 Water Tap Inspection Fee (100% due at Issuance of Building Permi0 $ 9,700.00 Wastewater Impact Fee (100% due prior to Council Approval) $ 21,825.00 $ 21,825.00 Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) $ 9,700.00 Street Sign Fee (100°,4 due prior to Council Approval) $ 1,954.71 $ 1,954.71 Street Light Fee (100% due prior to Council Approval) Construction Inspection Fee (2% of Construction Cost in the amount of $625,562.80 provided by developer Heath & Knight Properties.) $ 12,511.26 $12,511.26 TOTAL $133,290.97 $106,615.97 TOTAL AMOUNT DUE PRIOR TO AUGUST 14, 1992 $106,615.97 *This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $296.60 per light will be assessed. COPPELL PUBLIC July 29, 1992 Daneshmand, Ci~i~ Engineer Shohre Public Works Staff The following fees should be assessed on the above referenced project. Water Im~act Fee: 97 - 5/8" x 3/4" Domestic Meter/s - Irrigation Meter/s = Eireline Meter/s = 97 ESU's ESU's ESU's Total 97 ESU's ~ $650.00 ea = $63,050.00 100% due prior to Council approval of final plat. * This calculation does not include irrigation services. City Wastewater T~.act Fee: 9_!7- 5/8" x 3/4" Domestic Meter/s ~ 9__7ESU's 6 $225.00 = $21,825.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 97 Connections ~ $100.00 each = $9,700.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 97 Connections ~ $100.00 each = $9,700.00 100% due prior to issuance of building permit. $~reet T.£g~f~ng Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street $ig~s Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 97 Residential Lots at $150.00 each = $14,550.00 N~ Units (Multi family) at $75.00 each = $ N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram, Director of Public Works GIBBSSTA.HLP STREET SIGN ASSESSMENT for Gibbs Station The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 19 $1,207.26 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 2 23.20 Stop & Street Combo $ 96.85 7 $ 677.95 OTHER Poles 23.15 2 46.30 TOTAL $1,954.71 * Cost breakdowns may be obtained from Public Works bywritten request.