Loading...
Gibbs Station 1-CS 920729COPPELL PUBLIC WORKS ME~ORANDD~4 July 29, 1992 Shohre Daneshmand, Ci~i~ Engineer The following fees should be assessed on the above referenced project. Water Impact Fee: 97 - 5/8" x 3/4" Domestic Meter/s = 97 ESU's - Irrigation Meter/s = ESU's - Fireline Meter/s = ESU's Total 97 ESU's ~ $650.00 ea = $63,050.00 100% due prior to Council approval of final plat. * This calculation does not include irrigation services. City Wastewater Impact Fee: 97 - 5/8" x 3/4" Domestic Meter/s = 97 ESU's ~ $225.00 ~ $21,825.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 97 Connections ~ $100.00 each = $9,700.00 100% due prior to issuance of building permit. (Or in the irrigation meter-prior to issuance of meter). the case of Sewer Tap Inspection Fee 97 Connections @ $100.00 each = $9,700.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Sig~s Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 97 Residential Lots at $150.00 each = $14,550.00 .N~ Units (Multi' family) at $75.00 each = $ N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cC: Steven G. Goram, Director of Public Works GIBBSSTA.HLP for Gibbs Station STREET SIGN ASSESSMENT The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 19 $1,207.26 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 2 23.20 Stop & Street Combo $ 96.85 7 $ 677.95 OTHER Poles 23.15 2 46.30 TOTAL $1,954.71 Cost breakdowns may be obtained from Public Works by written request.