Gibbs Station 1-CS 920729COPPELL PUBLIC WORKS
ME~ORANDD~4
July 29, 1992
Shohre Daneshmand, Ci~i~ Engineer
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
97 - 5/8" x 3/4" Domestic Meter/s = 97 ESU's
- Irrigation Meter/s = ESU's
- Fireline Meter/s = ESU's
Total 97 ESU's ~ $650.00 ea = $63,050.00
100% due prior to Council approval of final plat.
* This calculation does not include irrigation services.
City Wastewater Impact Fee:
97 - 5/8" x 3/4" Domestic Meter/s = 97 ESU's ~ $225.00 ~ $21,825.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
97 Connections ~ $100.00 each = $9,700.00
100% due prior to issuance of building permit. (Or in
the irrigation meter-prior to issuance of meter).
the case of
Sewer Tap Inspection Fee
97 Connections @ $100.00 each = $9,700.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Sig~s Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
97 Residential Lots at $150.00 each = $14,550.00
.N~ Units (Multi' family) at $75.00 each = $ N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cC: Steven G. Goram, Director of Public Works
GIBBSSTA.HLP
for
Gibbs Station
STREET SIGN ASSESSMENT
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 19 $1,207.26
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60 2 23.20
Stop & Street Combo $ 96.85 7 $ 677.95
OTHER
Poles 23.15 2 46.30
TOTAL $1,954.71
Cost breakdowns may be obtained from Public Works by written
request.