TR9302-CS 921208Barton-Aschman Associates, Inc.
5485 Belt Line Road, Suite 199 Phone: (214)991-1900
Dallas, Texas 75240 Fax: (214) 490-9261
USA Metro: 263-9138
December 8, 1992
Mr. Mike West
Traffic Safety Specialist
Texas Department of Transportation
P.O. Box 3067
Dallas, Texas 75221-3067
RE: Coppell - Traffic Light Synchronization II Project
Contract No. 582TLF6043
Dear Mr. West:
We are submitting on behalf of the City of Coppell, the Quarterly Progress Report for the
above referenced project. The attached report has been approved by the City's project
manager, Mr. Rey Gonzales.
If additional information or discussion is needed, please let me know.
Sincerely,
BARTON-ASCHMAN ASSOCIATES. INC.
Kathi D. Mullins
Associate
KDM:tdb
Mr. Rey Gonzales
cc:~/t Ms. M. Shohre Daneshmand
encl.
Contract Number 582TLF6043
QUARTERLY TRAFFIC LIGHT SYNCHRONIZATION !1 REPORT
(Attach Additional Sheets As Needed)
1. City: City of Coppell
2. Project Name: Denton Tap Road
3. Reporting Period: From July 1, 1992 To September 31, 1992
4. Major accomplishments this reporting period:
· Preparing construction plans, specifications, and estimates for controller
upgrades and interconnect cable installation.
· Preparing three (3) preliminary optimized timing plans.
5. Major problems or delays this report period:
N/A
6. Is work progressing on schedule (yes) (no). If no, explain:
No - More time was required than originally anticipated for the design process.
7. Assistance needed? (yes) (no). If yes, explain:
No
8. Other information pertaining to this project/program:
kathiwe~t 12-8.rel~