Riverview Estates-CS 970227The City With A Beautiful Future
P.O. Box 478
Coppel[, Texas 75019
214-462-0022
Johnny Thompson
1780 East Beltline
Coppell, TX 75019
February27, 1997
RE-'
Riverview Estates
Development Fee Assessment
Dear Mr Thompson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $201,765.00 and forward to the
Finance Depattaxent along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer"s estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
Ken~eth M. Griffin, P.E.
Assistant City Manager/City Engineer
CCl
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
M~t, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
Project: Riverview Estates
Date: 2/2 79 7
DEVELOPMENT FEE TABLE
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $30,825.00 $30,825.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,350.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,531.86
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $48.30
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,980.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $29,700.00 $29,700.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $3,300.00
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee $3,300.00
(100% due at Issuance of Building Permit)
Park Fee $84,810.00 $84,810.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
rOTAL $158,880.16
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $145,335.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Riverview Estates
DATE: 2/2 ?~9 7
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
66 - 5/8 inch X 3/4 inch = 66
1 - 1 inch
0 - N/A
= 2.5
Total #: 68.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 67 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 66 Domestic Meter(s) @ $23.21
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$48.30
Water Meter Deposit Fee (Domestic):
Total #: 66 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 aa.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
66
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 66 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 66 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$30,825.00
$3,350.00
$1,531.86
$48.30
$0.00
$0.00
$1,980.00
$35.00
$29,700.00
$3,300.00
$3,300.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
66
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
N/A
N/A
N/A
N/A
$84,810.00
N/A
$0.00
Information not
available at this time
Information not
available at this time
Need submittal of
development contracts
+ See attached letter
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Riverview Estates
DATE: 2/27/97
ROADWAY IMPACT FEE:
Service Area *
7
Category ** Residential
Land Use ** Single-Family Detached
Building Size (Sq .Ft } N/A
Development Units ** 66
Vehicle Miles per Development Unit ** 2 85
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
$300
$56 d3000
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2 ,Page 3 - Roadway Impact Fee Study)
Consent agenda item 8C on the September 10, 1996 City Council
meeting agenda was approved to accept right-of-way dedication in lieu of
roadway impact fees.
I AMOINTD[E: $o0oI