Loading...
Riverview Estates-CS 970227The City With A Beautiful Future P.O. Box 478 Coppel[, Texas 75019 214-462-0022 Johnny Thompson 1780 East Beltline Coppell, TX 75019 February27, 1997 RE-' Riverview Estates Development Fee Assessment Dear Mr Thompson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $201,765.00 and forward to the Finance Depattaxent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer"s estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Ken~eth M. Griffin, P.E. Assistant City Manager/City Engineer CCl Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician M~t, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services Project: Riverview Estates Date: 2/2 79 7 DEVELOPMENT FEE TABLE TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $30,825.00 $30,825.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,350.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,531.86 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $48.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,980.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $29,700.00 $29,700.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $3,300.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $3,300.00 (100% due at Issuance of Building Permit) Park Fee $84,810.00 $84,810.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts rOTAL $158,880.16 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $145,335.00 DEVELOPMENT FEE WORKSHEET PROJECT: Riverview Estates DATE: 2/2 ?~9 7 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 66 - 5/8 inch X 3/4 inch = 66 1 - 1 inch 0 - N/A = 2.5 Total #: 68.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 67 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 66 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.30 Water Meter Deposit Fee (Domestic): Total #: 66 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 aa. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 66 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 66 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 66 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $30,825.00 $3,350.00 $1,531.86 $48.30 $0.00 $0.00 $1,980.00 $35.00 $29,700.00 $3,300.00 $3,300.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 66 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A N/A N/A N/A $84,810.00 N/A $0.00 Information not available at this time Information not available at this time Need submittal of development contracts + See attached letter Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Riverview Estates DATE: 2/27/97 ROADWAY IMPACT FEE: Service Area * 7 Category ** Residential Land Use ** Single-Family Detached Building Size (Sq .Ft } N/A Development Units ** 66 Vehicle Miles per Development Unit ** 2 85 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $300 $56 d3000 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2 ,Page 3 - Roadway Impact Fee Study) Consent agenda item 8C on the September 10, 1996 City Council meeting agenda was approved to accept right-of-way dedication in lieu of roadway impact fees. I AMOINTD[E: $o0oI