Loading...
WA9801-CS 990910H & W UTILITY CONTRACTORS September 10, 1999 Mr. Gary C. Hendricks, P. E. Shimek, Jacobs & Finklea, L.L.P. 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 City of Coppell State Highway 121 Water Line Dear Gary: Due to the shut down of this project we request a change order for remobilization when the conflict is settled. The cost to remobilize will be $4,200.00. We also request a change order to the cover the cost of barricades and traffic control while the project is on hold. The daily cost of this item is $55.00 per calendar day. Thanks for your consideration in this matter. Sincerely, Michael S. Haynes President 305 Main Street · Lake Dallas, Texss 75065 Metro (940) 321-5158 · FAX Metro (940) 321-5160