Loading...
Rozas Addn-CS041124PROJECT: DATE: DEVELOPMENT FE Rozas Addition, Lot 1, Block A 11/24/2004 Post'it' Fax Note 7671 Date Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Total #: 1 - 1 112 inch 1 - 1 1/2 inch 0 1 - 8 inch 12.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) = 5 ESU's = 5 ESU's = 0 ESU's = 2.5 ESU's Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $3,500.00 $150.00 Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $126.67 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $126.67 $126.67 L,,.._$3,371.21 Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $126.67 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $3,371.21 (100% due odor to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $30.00 $60.00~ Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due prior to issuance of building permit) @$280.00 ea. $1,400.00 $50.00 $50.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due odor to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 55'/1.2 I 30. OD