Rozas Addn-CS041124PROJECT:
DATE:
DEVELOPMENT FE
Rozas Addition, Lot 1, Block A
11/24/2004
Post'it' Fax Note 7671 Date
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Total #:
1 - 1 112 inch
1 - 1 1/2 inch
0
1 - 8 inch
12.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
= 5 ESU's
= 5 ESU's
= 0 ESU's
= 2.5 ESU's
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$3,500.00
$150.00
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $126.67
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$126.67
$126.67
L,,.._$3,371.21
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $126.67
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $3,371.21
(100% due odor to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$30.00
$60.00~
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
@$280.00 ea.
$1,400.00
$50.00
$50.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due odor to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
55'/1.2 I
30. OD