Total Price Calendar
Base Bid Days
Because of the urgency to have this traffic light installed, the City is requesting that bids be provided
on the following accelerated schedules in which the City is setting the calendar days.
Accelerated Schedule #1
Total Price Calendar
Base Bid Pins Days
Additional Compensation
TOTAL ITEMS 1 THRU 49 *$
*Includes additional compensation to complete project in sixty_ (60) calendar da_vs
6Ots by
In Words:
Accelerated Schedule/t2
Total Price Calendar
Base Bid Plns Days
Additional Compensation
TOTAL ITEMS 1 THRU 48 Plus//50 *$.
*Includes additional compensation to complete project in ninety (90) calendar da_vs
In Words:
o
o
Contract lime will conunence to mn as provided in the Contract Documents.
Communications concerning this Bid shall be addressed to the address of BIDDER indicated on
the applicable signature page.
BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible
personal property to be incorporated into the project. Said taxes are not included in the Contract
Price (see Instructions to Bidders).
The terms used in this Bid which are defined in the General Conditions of the Construction
Contract included as part of the Contrnct Documents have the meanings assigned to them in the
General Conditions.
The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to
stay within the City's available funds. Should the City elect to delete any portion, the contract quantities
will be adjusted accordingly. The City also reserves the fight to award the project based on the base bid
or either accelerated schedule.
SUBMITTED ON
Bidding and Contract Documents
1-27
UNIT PRICE BID SCHEDULE
TRAFFIC SIGNAL INSTALLATION
TR 98-01
Belt Line Road at Airline Drive
Item Quantity Unit Description and Price in Words Unit Total
No. Price Price
46 0 CY R&R Brick 4' Walk
Complete in Place
Dollars
and Cents
per CY.
47 0 SF R&R Brick Paver & Concrete
Complete in Place ,
Dollars
and Cents
per SF.
48 1 EA Upload / Download Device
Complete in Place
Dollars
and Cents
per each.
TOTAL BASE BID ITEMS 1 Thru 48
TANGIBLE PERSONAL PROPERTY COST
49 1 LS Additional Compensation
to complete project in 60 Days
Complete in Place
Dollars
and Cents
per LS.
50 I LS Additional Compensation
to complete project in 90 Days
Complete in Place
Dollars
and Cents
per LS.