Loading...
TR9801-CS 980623IN G D EPA R TI~E N T FAX COVER SHEET F~U:_~--~' ~ ,,. ~HO~ so.: FAX NO: ~ DATE: (o ~. TRANCED BY? TI:ME:_ ~u~r~ o~ p,,.c.~:$ (t~cr.uD~C, COV'~ SHEm') IF' YOU DO NOT R£CKIVE: ALL OF THEr' PAGES. PLEASE: CALL (972) 304-3679. TOTAL 1TEMS 1 THRU 48 In Words: Total Price Calendar Base Bid Days Because of the urgency to have this traffic light installed, the City is requesting that bids be provided on the following accelerated schedules in which the City is setting the calendar days. Accelerated Schedule #1 Total Price Calendar Base Bid Pins Days Additional Compensation TOTAL ITEMS 1 THRU 49 *$ *Includes additional compensation to complete project in sixty_ (60) calendar da_vs 6Ots by In Words: Accelerated Schedule/t2 Total Price Calendar Base Bid Plns Days Additional Compensation TOTAL ITEMS 1 THRU 48 Plus//50 *$. *Includes additional compensation to complete project in ninety (90) calendar da_vs In Words: o o Contract lime will conunence to mn as provided in the Contract Documents. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contrnct Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. The City also reserves the fight to award the project based on the base bid or either accelerated schedule. SUBMITTED ON Bidding and Contract Documents 1-27 UNIT PRICE BID SCHEDULE TRAFFIC SIGNAL INSTALLATION TR 98-01 Belt Line Road at Airline Drive Item Quantity Unit Description and Price in Words Unit Total No. Price Price 46 0 CY R&R Brick 4' Walk Complete in Place Dollars and Cents per CY. 47 0 SF R&R Brick Paver & Concrete Complete in Place , Dollars and Cents per SF. 48 1 EA Upload / Download Device Complete in Place Dollars and Cents per each. TOTAL BASE BID ITEMS 1 Thru 48 TANGIBLE PERSONAL PROPERTY COST 49 1 LS Additional Compensation to complete project in 60 Days Complete in Place Dollars and Cents per LS. 50 I LS Additional Compensation to complete project in 90 Days Complete in Place Dollars and Cents per LS. Bidding and Contract Documents