Loading...
TR9302-CS 920928Interconnect and Signal Upcjrades .................... ............. U iiT .......... TOTAL DESCRIPTION UNIT QUANTITY COST COST '~[-g hal Upgrades ...... [_S .... ' 1-; .............. 4526.60 Mobilization LS I 1500.00 1500.00 Construction Traffic Control LS I 1000.00 1000.00 6 Pair ~19 AWG Cable LF 11600 1.50 17400.00 Controller Cabinet and Installa LS I 2500.00 2500.00 ~Sand~Lake and MacArthur ..... TOTAL COST $26,926.60 Sandy Lake to Parkway Alternative Route UNIT TOTAL DESCRIPTION UNIT QUANTITY COST COST 2" C0~uit (Bored) .... ~-F .......................... i'~ .... ¥~-~' 1890.00 2" Conduit (Trenched) LF 600 7.00 4200.00 6 Pair ~19 AWG (Figure 8) LF 2500 3.25 8125.00 6 Pair ~19 AWG (Undergroun( LF 600 1.50 900.00 Pull Boxes EA 2 200.00 400.00' TOTAL COST $15,115.00 ALTERNATIVE ROUTE COST ESTIMATE Interconnect and Signal Upgrades $26,926.60 Alternative Route 15115.00 Subtotal $42,04I. 60 5% Contingency 2102.08 $44,143.68 ~ost-lt" bland fax transmittal memo 7671