TR9302-CS 920928Interconnect and Signal Upcjrades
.................... ............. U iiT .......... TOTAL
DESCRIPTION UNIT QUANTITY COST COST
'~[-g hal Upgrades ...... [_S .... ' 1-; .............. 4526.60
Mobilization LS I 1500.00 1500.00
Construction Traffic Control LS I 1000.00 1000.00
6 Pair ~19 AWG Cable LF 11600 1.50 17400.00
Controller Cabinet and Installa LS I 2500.00 2500.00
~Sand~Lake and MacArthur .....
TOTAL COST $26,926.60
Sandy Lake to Parkway
Alternative Route
UNIT TOTAL
DESCRIPTION UNIT QUANTITY COST COST
2" C0~uit (Bored) .... ~-F .......................... i'~ .... ¥~-~' 1890.00
2" Conduit (Trenched) LF 600 7.00 4200.00
6 Pair ~19 AWG (Figure 8) LF 2500 3.25 8125.00
6 Pair ~19 AWG (Undergroun( LF 600 1.50 900.00
Pull Boxes EA 2 200.00 400.00'
TOTAL COST $15,115.00
ALTERNATIVE ROUTE COST ESTIMATE
Interconnect and Signal Upgrades $26,926.60
Alternative Route 15115.00
Subtotal $42,04I. 60
5% Contingency 2102.08
$44,143.68