Round Oak-CS 930726July 26, 1993
Mr. Mike Daniel
Nathan D. Maier
Three Northpark, Suite 300
8800 N. Central Expy.
Dallas, TX 75231
The City With A Beautiful Futu e I!' ~ ....
P.O, Box 478
Coppell, Texas 75019
214-462-0022
RE: Round Oak Estates
Development Fee Assessment
Dear Mr. Daniel:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the
development fee calculations for Round Oak Estates.
Please provide a check made payable to the City of Coppell in the amount of $37,709.13 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please
provide our office a copy of the Engineer's Estimate or contract for this project so the construction
inspection fee can be verified.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify
payment of the required fees and assure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not hesitate
to contact me.
Sincerely,
Michael A. Martin, E.I.T.
CCi
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Date:
Project:
CITY OF COPPELL
DEVELOPMENT FEES
July 26, 1993
Round Oaks Estates
Water Impact Fee
(100% due prior to Council Approval)
Water Tap Inspection Fee
(100%due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee
(100%due at Issuance of Building Permit)
Water Meter Fee (Lots)
(100%due at Issuance of Building Permit)
Water Meter Deposit
(100%due at Issuance of Building Permit)
Street Sign Fee
(100%due prior to Acceptance of Project)
Street Light Fee
(100%due prior to Acceptance of Project)
Park Fee
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROVAL
+ Construction Inspection Fee
(2% of Project Cost due prior to
preconstruction meeting)
TOTAL
ASSESSMENT
$ 18,200.00
$ 2,800.00
$ 12,600.00
$ 2,800.00
$ 1,400.00
$ 623.00
$ 840.00
$ 253.53
$ 1,755.60
$ 9,800.00
$ 51,072.13
AIVIOUNT DUE
PRIOR TO
COUNCIL
APPROVAL
$18,200.00
$12,600.00
$ 253.53
$ 1,755.60
$ 4,900.00
$ 37,709.13
$ 37,709.13
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: July 22, 1993 ~
TO: Doug Stevens, Engineering Technlc~an
Steven G. Goram, Director of Public Wozq~s.
FROM: ~
RE: Development Fees for Round Oak Estates
The following fees should be assessed on the above
project.
referenced
Water Impact Fee:
28 - %" x ~" Domestic Meter/s = 28 ESU's
Total 28 ESU's @ $650.00 ea = ~
100% due prior to Council approval of final plat.
This does not include irrigation meters.
Wastewater Impact
28 - %" x %"
Total 28
100% due prior to Council approval
Residential meters = 28 ESU's
ESU's @ $450.00 ea = $12,600.00
of the final plat.
Water Tap Inspection Fee
28 Connections @ $100.00 each = $ 2,800.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
28 Connections ~ $100.00 each = $2,800.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
28 lots @ $50.00/lot = $1,400.00.
100% due prior issuance of building permit.
Water Meter Fee (Lots)
28 - %" x %" Residential Meters @ ~ = 623~~.00
100% due prior to issuance of building permit.
Water Meter Deposit
Residential - 28 meters ~ $30.00 ea = $840.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots @ $150.00 ea = $
Units (Multi-family) ~ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
Development Fees
Page 3
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
_ 28 Residential Lots ~ $350.00 ea = ~
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
Page ·
for ~
The following assessment is being made In accordance with the city
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following co6t of those si~ materials required are based on
curren~ pricing which is reviewed on a regular basis.
No Parking ~
S~ed Limit _ 65.54 2
Yield 58.56
stop
street Name
Stop & Street Combo___%~.85
OTHER
No O~tle~ 11.60
11.60
Cost breakdowns may be obtained from Public Works by written
request.
FEES.ROUNDOAK.HLp
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
May 24, 1993
Doug Stevens, Engineering Technician,s/
Rey Gonzales, Streets Superintendent~N/
Street Light Assessment - Round Oak Subdivision
The following assessment represents the number of light units as
established by T.U. Electric for this subdivision. Please ensure
that the developer receives a copy of this assessment and that the
fee is paid prior to final acceptance. Please provide me with a
receipt so that I can release T.U. to do the job. Thank you.
6 lights @ $292.60 per light - $1,755.60
If you have any questions, please call.
RG/dm
cc: Central File
ROUNDOAK.RG