Loading...
Robertson Pools-CS 981104The City With A Beautiful Future I~O. BOX 478 COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972462-0022 Ron Robert.son Robertson Commercial Pools $69 S. Coppell Road Coppell, Tx 75019 Robertson Commercial-'Poo]s Addition, Lot 1, Block A Development Fee Assessment November 4, 1998 Dear Mr. Robertson: Enclosed is a copy of the City of Coppell Developmem Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the anaount of $1,514.95 and forward to the Finance Depaxixaent along with a copy of the Fee Assessment table. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Michael A. Martin, P.E. Assistant City Engineer CC; Sennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: Robertson Cotntnercial Pools Addition, Lot 1, Block A DATE: 11/4/98 Water Impact Fee: Domestic Meter(s): Irrigation Metar(s): Fireline Meter(s): Total #: 0 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: 0 C~nnections ~ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) lrHgation/Fireline Water Meter Fee: Total 0: 0 Irrigation Meter(s) @ Total #: 0 . Additional Irrigation Metar(s) ~ Total #: 0 Fireline Metar(s) @ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of watar meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utilit~ Final Inspeetion Fee (AH developments): Total 0: 0 Lots ~ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $0.00 $o.oo $o.oo $o.oo $0.00 $0.00 $0.00 $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: NIA NIA Single-family @ $150.00 / Lot Multi-family ~ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family ~ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A $1,514.95 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessmenL The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) NIA Page 2 DEVELOPMENT FEE TABLE Project: Robertson Commercial Pools Addition, Lot I, Block A Date: 11/4/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00: (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $1,514.95 $1,514.95 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee N/A tOTAL $1,514.95 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,514.95 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Robertson Commoz~l Pools Addition, Lot 1, Block A DATE: 11/4/98 ROADWAY IMPACT Service Area * 4 Category ** Indastxial Land Use ** General Light Industrial Building Size (Sq. Ft.) 4,764 Development Units ** 4.764 Vehicle Miles pet Development Unit ** 1.0~ Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Develop~nt Units) x Vehicle Miles per Devdopment Unit) x (Fee per Vehicle Mile) = $1,514.9:5 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)