Loading...
Sand Point-CS 920127January 27, 1992 Mr. Tommy Canslor CCM Engineering Corp. 630 N. Highway 67 / Cedar ~ D~°pmentear Mr. Ca~e~??:~ssment PUBLiC :'",/E)RKS P.O. Box 478 Coppell, Texas 75019 214-462-0022 Enclosed is a revised copy of the City of Coppell Development Fee Assessment list for Sand Point Estates. Please disregard the previous list (dated January 23, 1992). The Wastewater Impact Fee was inadvertently omitted from that list. Please provide a check made payable to the City of Coppell in the amount of $25,868.95 plus 2% of the construction cost, and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the Engineer's Estimate for this project or the contract amount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: [/~teve Goram, Director of Public Works Alan Johnson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Daneshmand, P.E., Civil En§ineer SAND3 Date: Project: January 27, 1992 Sand Point Estates CITY OF COPPELL DEVELOPMENT FEES Total Fees $ 4,O50.0O Park Fee Assessment (27 lots X $150 Per Lot) (50% due at final plat approval) (50% due prior to bldg. permits issuance Water Impact Fee $ 17,550.00 (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ 2,700.00 (100% due prior to issuance of building permit) Wastewater Impact Fee $ 6,075.00 (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ 2,700.00 (100% due prior to issuance of building permit) Street Si~n Assessment $ 218.95 (see attached) Street Light Assessment , ($292.60 X .... poles) (see attached) Construction Inspection Fee $ (2% of construction cost) Amount Due Prior to Council Approval $ 2,025.00 17,550.00 $ 6,075.00 $ 218.95 TOTAL AMOUNT DUE: TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 33,293.95 THIS FEE CA/qNOT BE ASSESSED UNTIL AFTER TU LIGHTING PLAN FOR THE PROPOSED PROJECT $292.60 PER LIGHT WILL BE ASSESSED. $ 25,868.95 $ 25,868.95 Plus 2% Construction Inspection Fee ELECTRIC SUBMITS THE ONCE PLAN IS SUBMITTED SAND2