Sand Point-CS 920127January 27, 1992
Mr. Tommy Canslor
CCM Engineering Corp.
630 N. Highway 67 /
Cedar ~
D~°pmentear Mr. Ca~e~??:~ssment
PUBLiC :'",/E)RKS
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Enclosed is a revised copy of the City of Coppell Development Fee
Assessment list for Sand Point Estates. Please disregard the previous
list (dated January 23, 1992). The Wastewater Impact Fee was
inadvertently omitted from that list.
Please provide a check made payable to the City of Coppell in the amount
of $25,868.95 plus 2% of the construction cost, and forward it to Alan
Johnson, Finance Department, along with a copy of the Fee Assessment
list. In addition, please provide me with a copy of the Engineer's
Estimate for this project or the contract amount for verification of the
construction inspection fee.
If you should have any questions, please do no hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
cc: [/~teve Goram, Director of Public Works
Alan Johnson, Assistant Finance Director
Frank Trando, Finance Director
M. Shohre Daneshmand, P.E., Civil En§ineer
SAND3
Date:
Project:
January 27, 1992
Sand Point Estates
CITY OF COPPELL
DEVELOPMENT FEES
Total Fees
$ 4,O50.0O
Park Fee Assessment
(27 lots X $150 Per Lot)
(50% due at final plat approval)
(50% due prior to bldg. permits
issuance
Water Impact Fee $ 17,550.00
(100% due prior to Council approval
of final plat)
Water Tap Inspection Fee $ 2,700.00
(100% due prior to issuance of
building permit)
Wastewater Impact Fee $ 6,075.00
(100% due prior to Council approval
of final plat)
Sewer Tap Inspection Fee $ 2,700.00
(100% due prior to issuance of
building permit)
Street Si~n Assessment $ 218.95
(see attached)
Street Light Assessment ,
($292.60 X .... poles)
(see attached)
Construction Inspection Fee $
(2% of construction cost)
Amount Due
Prior to
Council
Approval
$ 2,025.00
17,550.00
$ 6,075.00
$ 218.95
TOTAL AMOUNT DUE:
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROVAL
$ 33,293.95
THIS FEE CA/qNOT BE ASSESSED UNTIL AFTER TU
LIGHTING PLAN FOR THE PROPOSED PROJECT
$292.60 PER LIGHT WILL BE ASSESSED.
$ 25,868.95
$ 25,868.95
Plus 2% Construction
Inspection Fee
ELECTRIC SUBMITS THE
ONCE PLAN IS SUBMITTED
SAND2