Sand Point-CS 920109The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
January 9, 1992
Mr. Tommy Canslor /
CCH Engineering Corp. ~ /
630 N. Highway 67
Cedar Hill,/Texas
Sand Point Estates
nt Fee Assessment
Dear Mr. Canslor:
Enclosed is a copy of the City of Coppell Development Fee Assessment list
along with a copy of the development fee calculations for Sand Point
Estates.
Please provide a check made payable to the City of Coppetl in the amount
of $19,793.95 plus 2% of the construction cost, and forward it to Alan
Johnson, Finance Department, along with a copy of the Fee Assessment
list. In addition, please provide me with a copy of the Engineer's
Estimate for this project or the contract amount for verification of the
construction inspection fee.
If you should have any questions, please do no hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
KMG/bd
cc: ~teve Goram, Director of Public Works
Alan Johnson, Assistant Finance Director
Frank Trando, Finance Director
M. Shohre Daneshmand, P.E., Civil Engineer
SAND3
Date:
Project:
January 23, 1992
Sand Point Estates
CITY OF COPPELL
DEVELOPMENT FEES
Total Fees
Park Fee Assessment
(27 lots X $150 Per Lot)
(50% due at final plat approval)
(50% due prior to bldg. permits
issuance
Water Impact Fee
(100% due prior to Council approval
of final plat)
Water Tap Inspection Fee $
(100% due prior to issuance of
building permit)
Wastewater Impact Fee
(100% due prior to Council approval
of final plat)
Sewer Tap Inspection Fee $
(100% due prior to issuance of
building permit)
Street Sign Assessment $
(see attached)
Street Light Assessment **
($292.60 X .... poles)
(see attached)
Construction Inspection Fee $
(2% of construction cost)
4,050.00
Amount Due
Prior to
Council
Approval
$ 2,025.00
17,550.00 $ 17,550.00
2,700.00
6,075.00
2,700.00
218.95 $ 218.95
NOTE: *
TOTAL AMOUNT DUE:
$ 33,293.95
19,793.95
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROYAL
$ 19,793.95
Plus 2% Construction
Inspection Fee
IF PROPERTY TO BE DEVELOPED IS IN THE COPPELL MUNICIPAL UTILITY
DISTRICT #1, WASTEWATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL
NOT BE COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL AGREEMENT IS
MADE BETWEEN THE CITY AND MUD.
THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE
LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED
$292.60 PER LIGHT WILL BE ASSESSED.
SAND2