Loading...
Sand Point-CS 920109The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 January 9, 1992 Mr. Tommy Canslor / CCH Engineering Corp. ~ / 630 N. Highway 67 Cedar Hill,/Texas Sand Point Estates nt Fee Assessment Dear Mr. Canslor: Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of the development fee calculations for Sand Point Estates. Please provide a check made payable to the City of Coppetl in the amount of $19,793.95 plus 2% of the construction cost, and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the Engineer's Estimate for this project or the contract amount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: ~teve Goram, Director of Public Works Alan Johnson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Daneshmand, P.E., Civil Engineer SAND3 Date: Project: January 23, 1992 Sand Point Estates CITY OF COPPELL DEVELOPMENT FEES Total Fees Park Fee Assessment (27 lots X $150 Per Lot) (50% due at final plat approval) (50% due prior to bldg. permits issuance Water Impact Fee (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ (100% due prior to issuance of building permit) Wastewater Impact Fee (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ (100% due prior to issuance of building permit) Street Sign Assessment $ (see attached) Street Light Assessment ** ($292.60 X .... poles) (see attached) Construction Inspection Fee $ (2% of construction cost) 4,050.00 Amount Due Prior to Council Approval $ 2,025.00 17,550.00 $ 17,550.00 2,700.00 6,075.00 2,700.00 218.95 $ 218.95 NOTE: * TOTAL AMOUNT DUE: $ 33,293.95 19,793.95 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROYAL $ 19,793.95 Plus 2% Construction Inspection Fee IF PROPERTY TO BE DEVELOPED IS IN THE COPPELL MUNICIPAL UTILITY DISTRICT #1, WASTEWATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL NOT BE COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL AGREEMENT IS MADE BETWEEN THE CITY AND MUD. THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. SAND2