Sand Point-CS 911231DATE: TO: FROM: RE: The following fees project. COPPELL PUBLIC WORKS ~MORANDUM December 31, 1991 Shohre Daneshmand, Acting City Engineer Public Works Staff Development Fees for Sand Point Estates should be assessed on the above referenced Water Impact Fee: 27 - 5/8" x 3/4" (Does not include Irrigation) Domestic Meter/s = 27 ESU's Irrigation Meter/s = ESU's Fireline Meter/s = ESU's Total 27 ESU's ~ $650.00 ea = $17,550.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: (MUD) 27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's ~ $225.00 = $6,075.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 27 Connections ~ $100.00 each = $2,700.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 27 Connections ~ $I00.00 each = $2,700.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 27 Residential Lots at Units (Multi family) $150.00 each = $4,050.00 at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works DEVELFEE.HLP STREET SIGN ASSESSMENT for Sand Point Estates The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 1 $ 63.54 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 1 $ 96.85 OTHER No Outlet $ 58.56 I $ 58.56 TOTAL $ 218.95 Cost breakdowns may be obtained from Public Works by written request. Revised 4/1/91