Sand Point-CS 911231DATE:
TO:
FROM:
RE:
The following fees
project.
COPPELL PUBLIC WORKS
~MORANDUM
December 31, 1991
Shohre Daneshmand, Acting City Engineer
Public Works Staff
Development Fees for Sand Point Estates
should be assessed on the above
referenced
Water Impact Fee:
27 - 5/8" x 3/4"
(Does not include Irrigation)
Domestic Meter/s = 27 ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = ESU's
Total 27 ESU's ~ $650.00 ea = $17,550.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee: (MUD)
27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's ~ $225.00 = $6,075.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
27 Connections ~ $100.00 each = $2,700.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
27 Connections ~ $I00.00 each = $2,700.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
27 Residential Lots at
Units (Multi family)
$150.00 each = $4,050.00
at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
DEVELFEE.HLP
STREET SIGN ASSESSMENT
for Sand Point Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 1 $ 63.54
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 1 $ 96.85
OTHER
No Outlet $ 58.56 I $ 58.56
TOTAL $ 218.95
Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91