Loading...
Sand Point-CS 911231 (2)SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (254) 361-7900 ROSS L. JACOBS, RE. I. C. FIN KLEA, RE. JAMES E. LAUGHLIN, RE. RONALD H CON ~Y, JOHN W. BIRKHOFF, RE. MATT ARMSTRONG, RE. JOE R. CARTER, RE. GARY C. HENDRICKS, RE. C. L. SHIMEK, RE. Mr. Kenne/M. Griffin, P.E. City En~nee r City ~f Coppell P_o~e Box 4780 ---Fib%at -- Ptall ~ and Plans First Review December 31, 1991 Dear Mr. Griffin: We have reviewed the final plat and construction plans of the Sand Point Estates Addition to the City of Coppell prepared by CCN Engineering Corp., for Frank Bamburg Building Company, Inc. The final plat and construction plans have been prepared in general conformance with the City's Subdivision Regulations. However, we have noted several items in need of correction prior to final acceptance. Our comments are detailed on the attached final plat check list, the City of Coppell Engineering checklist, and on the marked-up construction plans. We will calculate the preliminary development fees for this addition and provide you with a draft letter, once we have received the street sign assessment from Public Works. By copy of this letter, we are providing these comments to CCN Engineering Corp., and will hand them the marked-up plans and checklist at the December 31, 1991 Development Review Committee meeting. We are available to discuss this project further at your conv~ence. EnclosUre cc: ~Public Works, DRC Members Tayron Bowman, P&Z Coordinator M. Shorhe Daneshmand, P.E. CCN Engineering Corporation Date:. December 31, 1991 Review of tho Sand Point Estates Subdivision Ordinance of the City of Coppell, ?exaa. Subdivision for conformance with the FII4M, PLA~ & COHSTRUCTXOH PLAH~ Xtm ~Sect Ion of~ t In ~ [Ordinance :itEm Sho~n:Confomanc~: iTransmittal Letter & Payment of Fees :Scale Subdivision Name and Address of Developer ~oundary Lines · xisting Streets: Location Width .Subdivision Location 8~ivision ~y~t: b) Rl~ht-of-Nay~lll c) hs~n~ ~lls d) ~ ~t ~llc use ~ca~lons H~er*s Ass~lation ~lca~lons ~llding S~e~ck Lines Private ~r~r ~ale G ~o~Etl ~rtifi~tion ~erJe ~rtificatl~ ~lic Utility t IX-B t Yes ~ ~ Calculated I XX-C.2. ~ Yes I Yes t E lX-O. 3. 0 Yes ~ Yes E I I I I t 0 , t Show Trailwood t t Yes E Yes ~ Lane I I I I ~ i Yes t Yes t XX-C. 4. E I Yes I ' lX-C. 5. ' ' t i i Yes I I Yes i I Yes ! Yes i i Yes i Yes See Note 1 I I Yes I ~f. es t I Yes i Yes , [ Yes l t XXeC. 6. ! Yes e Yes ~ lX-C.7 t Yes ~ Yes ' IX-C.7. t No ~ No ~ None Shown ~ m-c.8. I Ye, I Yes i XX-C. Il.,~ Yes 1' No I' See Mark-Up I n-c.12.1 Yes I Yes t XXoC. 14 · I Yes ' Yes I I I I Xtra Easen~nt/R.O.W. A~reements Construction Plans: Pavinq Drainage iLandscape Plan ~Building Area & Parking {Non-Residential Only) HOmeowner's Association Agreement :section of~ ~ la ~Ordinanca ~Ite~ stm,,n~confor,~ence t IX-C. 16. t No ~ No ' lX-C. 19. ~ t ! N/A ' i~/A ' IX-C. 20. ~ I;o ' No Escrow Agreemen~ Res for Sandy La~e See Mark-Ups , See Mark-Ups See Mark-Ups ' See Mark-Ups ', Not Provided 1. 20' Utility Easement is required for 8" Water Line between Lots 12 and 13, Block A. 2. 20' Drainage Easement is required for storm sewer in Lot 4, Block B, along with additional width for corner clip. 3. Screening wall easement is not provided. FINAL PLAT & CONSTRUCTION PLANS (Page 2 of 2) DRC DATE REV/EW OF= CITY OF COPPELL PUBLIC WORKS ENGINEERING DIVISION BY ~' FINAL PLAT AND PLANS: ae l) 2) 3) 4) s) 6) ?) Please make the following additions and/or corrections on final plat as marked: ~ Name of the proposed subdivision must be consistent on the plat and all pages of the construction plans, etc. ~ Location . width . . . and.the name of all existing or recor~e~ streets intersecting the boundary of the tract. ~Ou3 '17%AiL~OO0 ~ ~ Delineate the existing and Droposed zonine of and the surrounding proper~~ the site J The accurate outline of all property which is offered for dedication for public use with the purpose indicated there on. Fire lanes must be shown on final plats. Certification by a registered ~lic Surveyor to the effect that the plat represents a survey made by him. - Delineate utility signature block on the final plat. Per Floodplain Management Ordinance #87390 (Art. 5, Sec. C, Item 4, Page 34), all subdivision proposals must have the following note placed on the preliminary and final plats~ "Floodplain Development Permit Application No. has been filed with the City of Coppell Floodplain Administrator, on , 19 .# 8) (Floodplain Administrator) No Comment. (Date) Page 1/3 2) The following contained in oJect, information, as marked, is required to be the final construction plans of the above Provide final construction plans, simultaneously 'with final plat .submittal. Final plans must have a cover%~ sheet, detailed design plans, and standard ~etail sheets. A cover sheet, for final construction plans shall include the followings Name of the project  Owner's name and address Engineer's name and address ~ Architect's name and address Vicinity map ~* Index list, covering all pages included in the set ~-* 'Plan Approval Paragraph', see attached 3) -, D. etailed final construction plans shall contain the .~ zollowing ~ ~ /* Ail required street paving plans and profi, le sheets. &%\~ /* Ail required storm drainage plans and prof.~le sheets. ~' ~ ~* Ail required alley paving pl. ans and profile sheets. ~ ~ ~7 * A compl~ccurate drainage area map and v~ / Ail requ re e rs of permision from adjacent ! . property, owners. ~' * Ail required water and sewer engineering plans. Provide barricading plans. Provide trench safety, sealed by a registered engineer in the State of Texas. Delineate proposed and existing water distribution system and pipe sizes. Delineate proposed and existing sewage collection system and pipe sizes Provide a Drainage Area Map covering two parts~ a) show On-site Drainage Map, on a scale of 1" = 20', 40'. 50'.etc~ . '.with all details as required in the Subdivision Ordinance; b) show the Off-site Drainage Map, on a scale 1" = 100', 200', etc Delineate the project's boundary on it, plus the ~e~s detailed drainage system, to clearly demonstrate the affect of such activities, drainage outfalls, on the adjacent properties and the Drainage Master Plan. 10) - 13) l¢) - 16) - l?) - all storm sewer systems must be designed for 100-year design frequency. Technical Paper 40 should be used to compute rainfall intensities, as per the Subdivision Ordinance, (Appendix "A', Page 30). Show the hydraulic calculations for each portion of the storm system on the profile, such as pipe size, Q100 (cfs), Oc (cfs), S, v (FPS) etc Ail lots within or adjacent to the 100-year Floodplain shall have the lowest floor elevation for each building site shown on the site grading plans. A permanent bench mark must be established with in a subdivision development, see attached Floodplain · Development checklist. Each sheet of the plans shall contain a title block and consistent page numbers. Ail appropriate fees as per subdivision ordinance must be paid. ~or ~dl ~¢ L~*rF.,,O Delineate a Revision block on each sheet. Revision dates must be shown on each sheet with Engineer's initials next to them. All above comments must be addressed, prior to Staff's recommendation for approval of the final plat and plans. Provide a written response on all comments with explanations provided on items not addressed as requested above. DRC/COMMENTS/ENG/FINAL SD/bb Page 3/3