Sandy L Add FL-CS 910924(~~ The City With A Beautiful Future
Mr. Larry Davis / / \
EMJ Corporat ion~ I
1303 Walnut Hil~__nane, Suite/13~
RE: Food Lion Developmen'~ Fees
~ Sandy Lake Lot 1,~ 1
Dear Mr. Davis:
RO. Box 478
Coppell, Texas 75019
214-462-0022
In our letter to you dated September 18, 1991, we calculated the
construction inspection fee for the Food Lion addition based on 2% of the
following construction cost:
$158,216 for utility construction
$ 18,216 for acceleration/deceleration lane
we now have received verification from your utility contractor, TRI DAL,
Inc., that the utility construction contract totaled $140,000, not the
$158,216 we had used. Further, we received pa!a~ent from TRI DAL, Inc. in
the amount of $2,800 for the construction inspection fee for their utility
work.
We have also verified payment of $365 received from Sizelove Construction
Company for the construction inspection fee for their work on the
acceleration/deceleration lane.
We are enclosing a copy of the revised development fee schedule, dated
September 24, 1991, which reflects the above described changes. All
development fees required for final acceptance of this project have now
been paid.
~,~~_~_~Sincerely,
M. Shohre Daneshmand, P.E.
Acting City Engineer
MSD/G~CH//
cc: ~teve Goram, Director of Public Works Taryon Bowman, P & Z Coordinator
Michale M. Clark, P.E., Winkelman & Assoc. Inc.
Gary L. Sieb
Larry Davis
Carolyn Bebermeyer
CITY OF COPPELL
DEVELOPMENT FEES
Date: September 24, 1991
Project: Food Lion, Inc.
Park Fee Assessment
{ Lots X $100 Per Lot)
(50% due at final plat approval)
(50% due prior to bldg. permits
issuance
Total
Total i Fees
Fees Paid
Amount
Payable
Prior to
Fi t
Acceptance
water Impact Fee $ 9,900.00
(100% due prior to Council approval
of final plat)
$ 9,900.00 $ -0-
Water Tap Inspection Fee
(100% due prior to issuance of
building permit)
$ 400.00 $ 400.00 $ -0-
Wastewater Impact Fee $ 2,110.00
{100% due prior to Council approval
of final plat)
$ 2,110.00 $ -0-
Sewer Tap Inspection Fee
(100% due prior to issuance of
building permit)
$ N/A $ N/A $ N/A
Street Sign Assessment $ N/A
(see attached)
$ N/A $ N/A
Street Light Assessment $ 292.60
15292.60 X 1)
(see attached)
$ 292.60 $ -0-
Roadway Assessment
(259.03 X $170.40/ft.)
$44,138.71 $44,138.71 $ -0-
Street Cut Permit
$ 100.00 $ 100.00 $ -0-
Construction Inspection
+ (2% of Construction cost
in the amount of $158,216.00,
provided by Winkelmann ~ Assoc.
Engineers}
$ 3,164.32 $ 3,165.00 $ -0-
TOTALS
$60,105.63 $60,106.31 $ -0-