Loading...
Sandy L Add FL-CS 910328COPPELL PUBLIC March 28, 1991 ~ Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Utilities Superintendent Development Fees for Food Lion The following fees should be assessed on the above referenced project. Changes have been made to reflect the change in the site plan regarding meter sizes. Water I~act Fee= 1 - I 1/2" Domestic Meter/s = 5 ESU's 1 - 1 1/2" Irrigation Meter/s = 5 ESU's 2 - 8" Fireline Meter/s = 5 ESU's Total 15 __ ESU's ~ $660.00 ea = $9,900.00 100% due prior to Council approval Wastewater Impact Fee: 1 - 1 1/2" Domestic Meter/s = __ of final plat. 5 ESU's @ $422.00 = $2,110.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District %1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 4 Connections ~ $100.00 each = $400.00 100% due prior to issuance of building permit. If you have any questions regarding this matter please advise. HLP/mp cc: Steven G. Goram, Director of Public Works File