Loading...
SBC-CS040407 T H I= C ! T Y 0 F COPiSE L MEMORANDUM FROM .THE DEPARTMENT OF ENGINEERING To: From: · Glenn Hollowell, Asst. Director of Public Works · Per Birdsall, Streets Operations Manager ~ Ted Dutt, Utilities Operations Supervisor Larry Davis, Construction Inspector ~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 Date: RE: April 7, 2004 WALK-THRU for SBC conduit installation Royal Ln ~ Bethel Rd A walk-thru for the referenced project has been scheduled for: Friday, April 9t~ at 9:00 a.m. Please let me know if I can be of further assistance. CC: Keith Marvin, P.E. Suzan Taylor, CIP Coordinator Lisa Cantu, SBC Communications "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" CO?FELL Department of Public Works April 8, 2004 08;12 am Final Date: Water Name Address Cross Street Location Description WOWA-04-0927 Larry Davis Engineering Royal Lane Bethel Road unknown (H) (W) SBC conduit installation walk-thru: Friday, 4/9/04 @ 9:00 am. Walk Throu~lh Left Door Knocker Spoke to Resident Called Resident Notify Water Billing Office Comments Assigned To Danny Hightower Old Meter # Reading New Meter # Reading Personnel Assigned Hours Quantity Field Comments: ~,'/'~4: T/~z/~'~/ ~/~ Parts - Equipment Used Signature: P.O. Box 9478 - 816 S. Coppell Rd - Coppell, TX 75019 - Phone (972) 462.5150 - Fax (972) 304-7091