Loading...
Sandy L Add FL-CS 910327FROM: u tend ntt RE: ~e~2 ~ese~o The f e e referenced project. The increase is due to the change in the metering scheme. Water Impact Fee= i 2" Domestic Meter/s 8 ESU's 1 2" Irrigation Meter/s = 8 ESU's 2 6" Fireline Meter/s = 5 ESU's Total 21 ESU's 100% due prior to Council Wastewater Impact Fee: = $13,860.00 approval of final plat. $660.00 1 - 2" Domestic Meter/s = 8 ESU's ~ $422.00 = $3,376.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 4 Connections @ $100.00 each = $400.00 100% due prior to issuance of building permit. If you have any questions regarding this matter please advise. HLP/mp cc: Steven G. Goram, Director of Public Works File