The f e e referenced
project. The increase is due to the change in the metering scheme.
Water Impact Fee=
i 2" Domestic Meter/s 8 ESU's
1 2" Irrigation Meter/s = 8 ESU's
2 6" Fireline Meter/s = 5 ESU's
Total 21 ESU's
100% due prior to Council
Wastewater Impact Fee:
= $13,860.00
approval of final plat.
$660.00
1 - 2" Domestic Meter/s = 8 ESU's ~ $422.00 = $3,376.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
4 Connections @ $100.00 each = $400.00
100% due prior to issuance of building permit.
If you have any questions regarding this matter please advise.